My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1601001 thru PS-1601500_ - PS-1601039
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1601001 thru PS-1601500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1601001 thru PS-1601500_ - PS-1601039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:51:19 AM
Creation date
4/20/2016 2:38:18 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1601039
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1601001 thru PS-1601500
Year2
2016
Address
N/S CLOVER RD 965'E/O CORRAL HOLLOW RD
Application
PACIFIC GAS & ELECTRIC -STOCKTON
Supplemental fields
APN
PS-1601039
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
SPECIAL PROVISION;;:! <br />Winter\iiTeailier Utility Work <br />1.SUPERVifSioN~The utiliiy company (permitiee)shall fuuRsh l"llll-time sllpervision of all work ts insllIe.compliance with the peinllt provision. <br />1.STA.RT OF WOID~:No Workwifbin the COlfiiyright-of-way shall be startea.unlililie utiliiy company <br />repl'esentative has made an evaluation of weather conditi01ls and has deteTlnmed the work CaG be . <br />"accomplished wider the provisions oHhe pemlit. <br />3.CLEAN PAVEMENT:Dirt and fiud s1J.allnot be deposited on the pavement outSIdethe area of work, <br />and ifinadveriently tTackedonto the [,cad travel way shan be removed iu:niJ.ediately.. <br />4.DAILYRESTORA.TIOI'j:.Private driveways aodroadintersections shall be.l'estoreddaily. <br />5.W'EATfillR.TIGHT CONDITIONS:All trenches shaJI be :Eil!edand compacted,ditches and other <br />draInage'facilities iegarded and opened,~mdthe entire work area restored to weather~tight condi.tionprior toanyra1.ll.
The URL can be used to link to this page
Your browser does not support the video tag.