My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1601001 thru PS-1601500_ - PS-1601040
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1601001 thru PS-1601500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1601001 thru PS-1601500_ - PS-1601040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:51:19 AM
Creation date
4/20/2016 2:38:26 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1601040
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1601001 thru PS-1601500
Year2
2016
Address
S/S OF IVY AV 17'E/O ODELL AV.
Application
PACIFIC GAS & ELECTRIC - STOCKTON
Supplemental fields
APN
PS-1601040
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
.'. <br />SPECIAL PROVISION!';' <br />\liinter Weailier Uiility Work <br />1.SUPERV'XStON~The utility company (permittee)shall furnish fuIl~time sllpervision of all work to insure,compliance with the permit provision, <br />2.START OF WORK:No workwrJrin the COlllltyright~of"way shallbe starter'!,lllltil the utility company <br />representative has made au evaluation of weather condrtiGllSand has determined the work can be ' <br />"accomplished under the provisions offh~pemut.' <br />3.CLKAN .pAVEI\1ENT:Dirt and mud sl,J.allnotbe deposited on the pavement outside the area ofwork, <br />and:if inadvertently tracked onto the rpM travel way shall be removed im:riJ.ediately, <br />4.DAILY RESTORA,TION':Private driveways and road intersections shall be restored daily. <br />5.WEATHER~TIGHT CONDITIONS:AIl trenches sh811be illled and compacted,clitches arId other <br />clminage facilities regarded and opened,arId the entire work area restored toweai:her~tight condition prior toarIyram,
The URL can be used to link to this page
Your browser does not support the video tag.