My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1601001 thru PS-1601500_ - PS-1601054
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1601001 thru PS-1601500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1601001 thru PS-1601500_ - PS-1601054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:51:21 AM
Creation date
4/20/2016 2:38:42 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1601054
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1601001 thru PS-1601500
Year2
2016
Address
E/S OF IAN CT 24'N/O LAIRD ST
Application
PACIFIC GAS & ELECTRIC -STOCKTON
Supplemental fields
APN
PS-1601054
Cross Ref
PWP7110005
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
,. <br />AI'eas: <br />The entire shoulder of the road is to be <br />resurfaced,The existing surfacing adjacent to the <br />trenched area shall be planed to accommodate <br />the overlay in a manner that doe,Snot cause <br />drainage concerns,The nearest pavement cut <br />shall be a minimum of three (3)feet from the edge <br />of pave men I,or the remaining pavement shall <br />also be removed and replaced.(See County <br />Standard Drawing 1\10.R-37), <br />2.Longitudinal Trenches within Traveled Lanes: <br />The entire traveled lane where the trench is located is to be <br />resurfaced with a one (1)inch asphalt concrete overlay,The <br />existing surfacing adjacent to the trenched area shall be planed <br />to accommodate the overlay in a manner that does not cause <br />drainage concerns.The overlay shall be in accordance with State <br />Standard Specifications,Section 39.Aggregate gi"adation shall be <br />consistelit with the existing surfacing matel'ial.(See County <br />Standard Drawing 1\10,R-37). <br />3,Cross-C ulti ng: <br />Cross-cutting is allowed at a minimum interval of 150 feet.At each <br />cross-cut location a minimum of ten (10)feet on each side of <br />trench shall be planed and resurfaced withone (1)inch asphalt <br />concrete.If cross cuts arewithin the 150 feet minimum interval,the <br />entire section between the first and last cross cut shaH be planed <br />and resurfaced with one CI)inch asphalt concrete.(See County <br />Standard Drawing 1\10.R-36). <br />4.The conditions described in paragraphs 1,2 and 3 above wiH not <br />apply if resurfacing is scheduled within two years . <br />.•R~~03_LocaLBoaaSJ <br />A.Surfacing Age Under Three (3)years:1\10 pavement cuts allowed, <br />Exceptions may be approved in accordance with Section 2-5.04 <br />EXCEPTIOI\IS . <br />.It B,~Sujjac5ngAgelhlee (~)fo F'ive (Sf"reaIT>l <br />1.Longitudinal cuts are permitted.A seal coat is required for that half of <br />the roadway containing the trench.(See County Standard Drawing <br />1\10.R-37). <br />42
The URL can be used to link to this page
Your browser does not support the video tag.