My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1601001 thru PS-1601500_ - PS-1601054
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1601001 thru PS-1601500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1601001 thru PS-1601500_ - PS-1601054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:51:21 AM
Creation date
4/20/2016 2:38:42 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1601054
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1601001 thru PS-1601500
Year2
2016
Address
E/S OF IAN CT 24'N/O LAIRD ST
Application
PACIFIC GAS & ELECTRIC -STOCKTON
Supplemental fields
APN
PS-1601054
Cross Ref
PWP7110005
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
SPECML PROVISION:'i <br />W'interWeatlier Utilii:y Work <br />1.SUPERVllStON:TIleutility cmpany (permittee)shall fUD'RSh fuil-timB Sllpenrisionof all work to insure.compliance with the pe:i:IDitprovision. <br />2.START OF WORK:No work wi"Jrinthe Countyright-of'way shall be started until the utility company <br />representrrlive has made an evaluation of weather cOllditiells and has detenrrmed the work can be' <br />'\accomplished Ullderuie provisions ofu1e pem1it. <br />3.CLE.AflP AJJEMENT:Dirt and mud s1;1811 not be deposited 'on the pavemerrt outside the area of work, <br />andif:rnadvertently tracked onto the rpad travel way shall b6 removed Im:ri:wdiately. <br />4.nAIL Y HESTORA.TION:'Private driveways md road intersections shall be.restored daily. <br />5.WEATfillR-TIGHT CONDITIONS:All trenches shan be filled and compacted,ditches and oilier <br />dminage facilities l'egarded and opened,md the entire work area restoredto weather~tight conditiorr prior to <br />anyraJJJ.,
The URL can be used to link to this page
Your browser does not support the video tag.