Laserfiche WebLink
!I <br />.•1 <br />r"---..---"----.-."..---~-.-.."-------.-----.-'-'-'''-.0 ••..•.._- <br />NOTES: <br />1.If the distance between cross-cuts ore less then 150'the entire Clrea between <br />corss-cuts shall be planed and resurfaced with one (1)inch of Asphalt Concrete. <br />2.The resurfacing requirements sholl be in addition to County Standard Drawing No.R-29 . <br />3.Resurfacing for Bell Holes shall meet these requirements.If excavation occurs within <br />the shoulder or lane,only that area shall be resufaced as shown. <br />4.If cross'.cutting is performed on Local Roads at Intervals less then 150'a SeQI <br />Coat for that half of the roadway containing the trench con be used in lieu of <br />resurfacing.Section 2-5.03 (B-2). <br />G"Paved Shoulder --t=1 I <br />r <br />CLw <br />o <br />Lrb <br />L 1 <br />1w <br />rb <br />Lrb~L <br />_.. <br />Approved by: <br />No.Revision Descri tion Date