My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1601001 thru PS-1601500_ - PS-1601060
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1601001 thru PS-1601500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1601001 thru PS-1601500_ - PS-1601060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:51:25 AM
Creation date
4/20/2016 2:39:19 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1601060
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1601001 thru PS-1601500
Year2
2016
Address
S/S OF 12TH ST 397'W/O B ST
Application
PACIFIC GAS & ELECTRIC - STOCKTON
Supplemental fields
APN
PS-1601060
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
ClfJ1{"CT I.ru~.L'J .:.l.l-'.Lu PROVISIONS <br />"(Ihnte.rWeather Utility Work <br />1.SUPERVii'StON:The utility compauy (permittee)shall :fu:mishfull.tim,e supervision of all work to insure.compliance with the pemlit provi'iion. <br />2.ST.A.RT OF WORIe(:No work wifhinilie Countyright.of.way shall be startea untililie utility company <br />representative has made an evaluation of weather condltiens and has determined the worlecan be ' <br />"accomplished under the provisions oHhe pemJit <br />3.CLEj\~PAVEI\IfENT:Dirt and mud sl;1aIlnot be deposited on the pavement outside the area of work, <br />and if inadvertently tracked O1Itothe rpad travel way shall be removed ilJJJilediately. <br />4.DAILY RESTORA.TION:'Private driveways and road intersections shall be.restoreddaily. <br />5.WEATI-ffiR.TIGHT CONDITIONS:All trenches shall be filled and compacted,ditches and oilier <br />cIminage facilities regarded and opened,aud the entire work area restored toweather~tight c01ldi.tionprior to <br />any ram.
The URL can be used to link to this page
Your browser does not support the video tag.