My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600000 thru PS-1600500_ - PS-1600397
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1600000 thru PS-1600500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600000 thru PS-1600500_ - PS-1600397
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:47:20 PM
Creation date
4/21/2016 10:23:09 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1600397
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1600000 thru PS-1600500
Year2
2016
Address
S/S CHEROKEE RD 200' N/O TEEPEE DR
Application
SEFNCO- CHRIS PERRY
Supplemental fields
APN
PS-1600397
Cross Ref
PWP7110005
CrossRef
PWP7110005
Type (2)
Encroachment Permit (EP)
Zip
94550
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
...' <br />SPECIAL PROVISIONS...'.,'.'.,.'' <br />Winter Weather Utility Work <br />.'.' <br />1.SUPERVISION:The utility comp3l?'Y(perrilitte.e)shall furniSh fu11~timesUpervision.of all work to insure <br />.compliance with the permit provision.......,."....".', <br />2.START OF WORK:No work within thciCounty.right-of-way shall be started until the utility company <br />representative has made an evaluation of weather conditions and has determined the work can be . <br />"accomplished under the provisions of the.permit .. <br />3.CLEANPAVEMENT:.Dirt and ~ud sh"aUno:tbe d~p~;it~d.on the pavement outside the area of work, <br />and ifinadvertently trackedonto ..the.road tql.)T~1'Yay"~~allbe.removed in;mi.ediafely.. <br />4.DA!LY RESTORATION:.Pri-ifatedriveways.aridtoad intersections shall be restored daily. <br />S.WEATHER-TIGHT CONDmONS:..A)1:tJ;enchesshall be.fi,lled and compact"erl,.ditches and other . <br />drainage facilities regarded and opened,andihe .entire work area restored t~.weather-tight condition'prior to ..any~...::.......'...','..."."'.. <br />.----- <br />-,.:'.' <br />." <br />-..',":," <br />'.'. <br />"." <br />.',': <br />,'...:.'~.... <br />,.... <br />,'.'.:. <br />... <br />,."
The URL can be used to link to this page
Your browser does not support the video tag.