My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600000 thru PS-1600500_ - PS-1600397
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1600000 thru PS-1600500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600000 thru PS-1600500_ - PS-1600397
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:47:20 PM
Creation date
4/21/2016 10:23:09 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1600397
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1600000 thru PS-1600500
Year2
2016
Address
S/S CHEROKEE RD 200' N/O TEEPEE DR
Application
SEFNCO- CHRIS PERRY
Supplemental fields
APN
PS-1600397
Cross Ref
PWP7110005
CrossRef
PWP7110005
Type (2)
Encroachment Permit (EP)
Zip
94550
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
~ <br />KncwYl!lafl below.Call beI0l'fo"d!9' <br />FZiI PROPOSED BORE PIT ""EXISTING POLE WI NEW RISER @@0 MANHOLE <br />-',STREETISIGNAUTRAFFIC LIGHT 0o----,r--LANDSCAPINGfTREE -.----SEWER <br />@ CONSTRUCTION NOTE <:l=>TRAFFIC FLOW ------WATER <br />V FIRE HYDRANT 0 PROPOSED VAULT _._---STORM DRAIN,-,POTHOLE LOCATION POWERom@!]CATCH MSIN .--_._--- <br />r,~BUILDING OUTLINE -----COMMUNICATIONS~/;;l CHANNELIZATION <br />\7 5+39 STATIONING -----GAS <br />2 OF 6 <br />NOTES &LEGEND <br />>-C- <br />D::D::w w•••w <br />!:C ~0D1D:: <br />..I Wc:s::I:CJ CJD::N0M <br />Z ~M <br />0 I- <br />M -It)==r--D::N WND. <br />,, <br />•I <br />COMCAST <br /><]¥~.~~== <br />PROPOSED BORE <br />EXISTING PULL THRU <br />PROPOSED OPEN TRENCH <br />AERIAL STRANO <br />~"-"-'-"7''';'~''=i&Okt.-''-''-''-''- <br />-"-"i='1L.lS.iNGPUU:THRU-"-"- <br />."-"-"j;';'i'"eiPE;;lR£~"-"-"- <br />LEGEND: <br />RIGHT-OF-WAY <br />TRAfFIC LANE <br />CENTERLINE <br />FENCE <br />GAURDRAll <br />FIBER PLACEMENT NOTES: <br />1.CONTRACTOR IS RESPONSIBLE fOR LOCATING ALL UTilITIES 48 HOURS PRIOR TO CONSTRUCTION ACTIVITY <br />SEE LOCAl DIRECTORY FORCONTACT TELEPHONE NUMBER OF LOCAL CAll BEFORE YOU DIGAGENCY. <br />2.CONTRACTOR SHALL RECORD SEQUENCE 1#OF FIBER CABLE AT EVERY WORK POLE.MANHOLE,FlBER STORAGE LOOPANDTAILLOCAnON.CONTRACTOR TO PROVIDE PROJECT MANAGER \lVITHSEQUENCE NUMBERS AT PROJECT <br />COMPLETION. <br />3.SLACK lOOP ANDSNOWSHOE STORAGE lOCATIONS SHALL BEOETERMINED ON CONSTRUCTION DRAWINGS.HOWEVER, <br />REEL LENGTHS OF FIVE HUNDRED FEET (500')OR LESS ON LARGE COUNT FIBER OR THREE HUNDRED FEET (300')OR LESS <br />ON SMALL COUNT FIBER ARE DIFFICULT TO USEAND SHOULD BE PLACED AS FSL'S.NOTCUTAND RETURNED. <br />4.FIBER OPTIC IDENTifiCATION TAGS SHALL BE PLACED AT EVERY WORK POLE,MANHOLE,FIBER,STORAGE LOOPS,SPLICE <br />CASES AND WHERE INDICATED BYPROJECT MANAGER.TAGSNEED TO BE PLACED SOASTO BE READ FROMTHE GROUND. <br />5.CABLE LUBRICATION SHALL BEUSED TO REDUCE PULLING TENSION.lUBRICANTS MUST NOTCONTAIN ANY PETROLEUM <br />PRODUCTS. <br />6.A 100FOOT FIBERCOIL MUST REMAIN INAll VAULTS UNLESS OTHERWISE NOTED. <br />7.ALL aURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH WARNING TAPE AND A TRACER WIRE,AT RISER POLES THE <br />LOCATE WIRE SHALl BEACCESSIBLE AT THE BASEOf THE RISER <br />8.ALL RISERSWILL BECAPPED AT ALLTIMES. <br />9.ALL FIBER SHALL BE MARKEDASTO DIRECTION IN EACH VAULT.RED-NORTH,GREENoSOUTH,YEllOW-EAST.AND <br />BLUE.WEST,DONOT TAPE FIBER CABLES TOGETHER INRISER. <br />DISCLAIMER: <br />7.THE PROJECT MANAGER WILL NOTIFY BUILDING MANAGEMENT V\1-lENWORK WILL BEGIN ON <br />BUILDING.CONTRACTOR TO COORDINATE ROOMACCESS AND WORK STARTAND STOPTIMES <br />WITH BUILDING MANAGEMENT. <br />6.WHERE PERMITS FROM STATE,COUNTY,CITY,RAILROAD OR GOVERNMENT AGENCIES ARE <br />REQUIRED,ALL WORK PERFORMED WILL COMPLY WIlli THESE AGENCIES STANDARD <br />SPECIFICATIONS. <br />GENERAL NOTES: <br />1.ITISTHE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR TO VERIFY ALL RIGHTOf WAY <br />BEFORE CONSTRUCTION ISTO BEGIN.NO UNDERGROUND INSTALLATION REPRESEtfTED WITHIN <br />THESE PLAN SHEETS ISPROPOSED OUTSIOE OF THERIGHT Of WAY. <br />2.THE UNDERGROUND ROUTE DEPICTED IS PREliMINARY AND WlLLlMAY VARY ONCE UTILITIES HAVE <br />BEEN FIELD LOCATED. <br />10.ANYCHANGE INPROJECT SCOPE,INCLUDING BUTNOT LIMITED TO,CONDUIT lENGTH.CONDUIT <br />PATH,AERIAL PATH ETC.,MUST BEAPPROVED BYTHE PROJECT MANAGER <br />'11.ALL CORING/CONSTRUCTION THAT WILL CAUSE NOISE AND/OR VIBRATION SHALLBE DONE WITHINALLOweO(9AM.3PM)BUSINESS HOURS. <br />12.ANY ANOAlL UNDERGROUND UTILITIES ENCOUNTERED ARE THE RESPONSIBILITY OF THE <br />CONTRACTOR TO LOCATE,PROTECT,AND REPAIR,IFDAMAGED. <br />13.ALL FOOTAGES ARE BASED ON FIELD GATHERED MEASUREMENTS,ASSUCHSOME VARIANCE <br />SHOULD BEANTICIPATED.ADJUST AS NEEDED. <br />14.ALL BURIED CONDUITICABLE WILL BEPLACED AT36"MINIMUM COVER.SITE HASPOTENTIAL FOR <br />ROCK THAT WOULD PREVENT THE ABILITY TO PROVIDE THE MINIMUM COVER.INCASES V\1-lERETHE <br />MINIMUM COVER CANNOT BEACHIEVED,THECONDUIT SHALL BE PLACED INA SCH40EMT SLEEVE <br />OR APPROVED eQUIVALENT. <br />15.WATER.SE'A'ER,STORM SEWER AND EASEMENT LOCATIONS ARE BASED OFFOF CITY MAPS, <br />NOT FIELD VERIFIED <br />16.BORING OFAC PAVING ISREQUIRED AT AlL LOCATIONS AS INDICATED ON PLANS. <br />17,AT NOTIME SHALL CURBS,GlJTTERS ORHANDICAP BEDISTURBED. <br />18.DOOR HANGERS ARE TO BE PLACED A MINIMUM OF 72HOURS PRIOR TO STARTOf CONSTRUCTION. <br />111.PRIOR TOSTART OFCONSTRUCTION,CONTRACTOR SHAlL PLACE MESSAGE BOARDS STATING LANECLOSURES,AND DELAYSA WEEK IN ADVANCE.lOCATION OF THE MASSAGE BOARDSHALL BE <br />COORDINATED WITH THE CITY INSPECTOR AT THE PRE-GONSTRUCTION MEETING. <br />20.LANE CLOSURES CANNOT EXCEEO MORE THAN 300 FT.ATATIME.fOR SAFETY PURPOSESTHERE <br />SHAlL BEONLY ONECLOSURE AT A TIME AlONG INTERNATIONALBLW.MORE FLAGGERS WILL BE <br />NECESSARY TO HELP VEHICLESAND PEOESTRIANS INTHE'NORK ZONES DURING THE LANE <br />CLOSURES. <br />8.THE PROJECT MANAGER IS TO BE NOTIFIED BYTHE CONTRACTOR 24 HOURS PRIORTO <br />CONSTRUCTION.SEE COMPANY CONTACT LISTFOR CONTACT NAME(s)AND TELEPHONE NUMBERl'), <br />9.THE PROJECT MANAGER WILL RESERVE THE RIGHT TO INSPECT ATANY TIMETHE WORK BEING <br />PERFORMED BY THE CONTRACTOR IF PROJECT MANAGER DETERMINES THATTHE 'NORK IS NOT <br />BEING PERFORMED TO MINIMUM QUAUTY STANDARDS,THENTHE CONTRACTOR SHALL PROVIDE <br />RfINORKAT HIS OWN COST. <br />3.ANCHORING FOR THEAERIAL CONSTRUCTION ISTYPICALLY DETERMINED DURING CONSTRUCTION <br />AND ISCOLLECTED INTHE AS-BUILT PHASE. <br />4.BURIED FIBER OPTICWARNING SIGNS SHALL BE PLACEDAT EACH SIDEOFAll ROAD CROSSINGS. <br />AT CULVERTS,DITCHES AND IN A STRAIGHT LINE OF SIGHT SPACING OFAPPROXIMATELY 500fEET. <br />5.DEVIATIONS FROM THE ENGINEEREO ROUTE REQUIRESA PROJECT MANAGER AND RIGHT-Of-WAYOVv'NERORCARETAKER APPROVAL PRIORTO CONSTRUCTION. <br />1.ALl VAULTS I HANDHOLES TO BE EQUIPPED WITH SECURITY LIDS WITH LOCKING BOLlS. <br />2.GROUND RESTORATlOWRIGHT .oF.WAY SHALL BERESTORED TO ORIGINAL OR BEITER CONDITION. <br />3.ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BEA MINIMUM OF36'RADIUS UNLESS <br />SPECIFIED OTHERWISE.
The URL can be used to link to this page
Your browser does not support the video tag.