My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600000 thru PS-1600500_ - PS-1600439
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1600000 thru PS-1600500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600000 thru PS-1600500_ - PS-1600439
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:47:23 PM
Creation date
4/21/2016 10:31:18 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1600439
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1600000 thru PS-1600500
Year2
2016
Address
N/S COTTA RD 200' E/O GUARD RD
Application
PACIFIC GAS & ELECTRIC - STOCKTON
Supplemental fields
APN
PS-1600439
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
Zip
95201
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
I <br />3'-0"t <br />00+20",Min <br />10" <br />+ <br />See Note 1 Below~ <br />~Y~!"~:%"::~:~;~~ik!i 6;y~!" <br />T ~~See Note 2 Below /~3'-0"~'Compact in 12"maxt~jf:.layers to a,'min relative1")'tompaction of 9570 <br />"~~under pavement andVar~:'<90%outside pavement.t ~:x Compact .in'24"max <br />~'~layers'to a min rerative00/2 /C(,«'compaction of 85%.",,,- <br />".0-).~-);~'Compact in 6"layerstoaminreiativecompactianof90%. <br />10" <br />'RIGID CONDUIT FLEXIBLE CONDUIT <br />,NOTES: <br />1.New pavement shall be 1"thicker than e)listing pavement.mmlmum, <br />of 0.25,Ft.New base shall be 1"thicker thaA existing b,ase,min'of 0:50 Ft. <br />2.Select native material or,imported grantllar materiel as approved by the Director <br />of Public Works:Backfill with materials equal to or better than the existingpavementandbase.in quality., <br />3.Relative compaction'of materials sholl be tested in,accordance with <br />the-State of California,Dept.of Transpbrtation Testing Manuals,..testmetha.d No.,California 216 or 231. <br />4.All existing pavement shall be,neatly cut to line pribr to trench excavatiOn,.., <br />5.Jetting or ponding will be permitted within the street right-of-way 'with <br />a .3 year bond.when approved by the Director of Public Works.', <br />6.Wlien shown by soil composition and compactability,ninety percent (90%) <br />compaction may be used,when.approved by the Director of 'Public Works. <br />7:Special bedding and backfill requirements may be shown on',the plans orspecifiedin'the ~peoiaI provisions. <br />Approved by: <br />No.Revision.Oeseri'tion Dote <br />COUNTY.OF SAN JOAQUIN <br />DEPARTMENT OFPUBLTC WORKs <br />Dale:bEC ,2014 Std.Dwg.,No.
The URL can be used to link to this page
Your browser does not support the video tag.