Laserfiche WebLink
NOTES: <br />1. If the distance between cross-cuts are less then 150' the entire area between <br />corss-cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br />2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br />R-29. <br />3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br />the shoulder or lane, only that area shall be resufaced as shown. <br />4. If cross-cutting is performed on Local Roads at intervals less then 150' a Seal <br />Coat for that half of the roadway containing the trench can be used in lieu of <br />resurfacing. Section 2-5.03 (B-2). <br />C <br />o A- <br />r.Q) <br />D- L_ <br />U U <br />Q <br />Q) O <br />ACU <br />O <br />Cn <br />Paved Shoulder—i X Q)Q <br />U U v—O O <br />OL_ <br />C C <br />W D C U1a_ . <br />T- <br />CDO <br />1 <br />U+ <br />z I <br />N <br />V) 1 W <br />T_ <br />O <br />441 <br />O <br />L O <br />u <br />E O <br />TRENCH CUTTING POLICY Approved by: <br />CROSS CUTTING OF Ay_ljj <br />COUNTY ROADWAYS No. Revision Description Date <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKSWorkingforVOLT <br />Date: MAY 2015 Std. Dwg. No. R-36