Laserfiche WebLink
2.Cross-cutting is allowed under the same conditions as Section 2- <br />5.02{B)(3).If cross-cuts.occuLwithin the 150 feet minimum interval, <br />resurfacing may be substituted with a slurry seal for that half of <br />the roadway.(See County Standard Drawing No.R-36). <br />2-5.04 Exceptions <br />Excavation is prohibited in newly renovated Counly roadways for three (3) <br />years after a notice of completioll has been filed for a roadway improvement <br />project,or a new roadway has been accepted.The Director of Public Works <br />may approve exceptions that are in the best interest of the public,including <br />but not limited to:. <br />A.An emergency that endangers life or property. <br />B.For repair or modification to prevent interruption of essential utility <br />service. <br />C.For relocation work that is mandated by County,State 01"Federal <br />law. <br />D.For service for buildings where no other reasonable means of <br />providing service exists. <br />E.For potholing to verify utility.depth or location. <br />F.For trenchless excavations greater than three feet in depth of cover <br />over the utility facility,and not requiring a significant surface <br />Incision greater than industry bore pit standards . <br />.Exceptions must be requested and submitted in writing to the Department. <br />Payment of a nonrefundable processing fee-is also required.Exceptions <br />will be reviewed using the Departments Action Approval process,which <br />requires the recommendation of a Deputy Director. <br />.' <br />43