Laserfiche WebLink
NOTES: <br />1.If the distance between cross-cuts are less then 150'the entire area between <br />corss-cuts shall be planed and resurfaced with one (1)inch of Asphalt Concrete. <br />2.The resurfacing requirements shall be in addition to County Standard Drawing No.R-29. <br />3.Resurfacing for Bell Holes shall meet these requirements.If excavation occurs within <br />the shoulder or lane,only that area shall be resufaced as shown. <br />4.If cross-cutting is performed on Local Roads at intervals less then 150'a Seal <br />Coat for that half of the roadway containing the trench can be used in lieu of <br />resurfacing.Section 2-5.03 (B-2). <br />t <br />J. <br />t:;'00 <br />~Ul.-UlEe:.Jo <br />'0 <br />Co OJ~~OJOJ~Lu~Uo C't:OJ 0::lCO <br />Ul 0 ~ <br />O)..c 0c;t:..c:;:;3:0..Ul Ul.x (])« <br />Q)g'+- <br />OJ 't:0C::l.cJ-S'gJ gL._ <br />a.w <br />G'I•ii, <br />.I I <br />,~i i~!i i <br />:3!i i <br />U11 I ', <br />,I I I <br />, <br />,I I <br />I i <br />a. <br />Paved Shoulder---r-l <br />Approved by: <br />No.1 Revision Description I Date <br />;WJftr <br />R-36 <br />TRENCH CUTTING POLICYCROSSCUTTINGOFCOUNTYROADWAYS <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />Dale:MAY 20151Std.Dwg.No.Working for YOU