My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600000 thru PS-1600500_ - PS-1600489
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1600000 thru PS-1600500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600000 thru PS-1600500_ - PS-1600489
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:48:26 AM
Creation date
5/26/2016 10:21:51 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1600489
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1600000 thru PS-1600500
Year2
2016
Address
CALHOUN WY(HARRISBURG TO LESSBURG)
Application
PACIFIC GAS & ELECTRIC - STOCKTON
Supplemental fields
APN
PS-1600489
Cross Ref
PWP730052
CrossRef
PWP730052
Type (2)
Encroachment Permit (EP)
Zip
95201
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
SPECIAL PROVISIONS. <br />..:", <br />Winter Weather Utility Work <br />.'" <br />1.SUPERVISiON:The utility c6mpalfy (per)liitte.e)s4all furuisll ful1~timesupervision of all work to insure <br />.compliance with the permit provision. <br />••••.'•I. <br />2.START OF WORK:No work within the .County.right-of-way shall be started until the utility company <br />representative has made an evaluation of weather conditions and has determined the work can be' <br />"accomplished under the provisions of the'permit.' <br />3.CLEAN PAVEMENT:Dirt and mud sl;J.a1lno:tbe d~p~;ii~d'on the pavement outside the area of work, <br />and if inadvertently tracked onto'the .road tr!lv:~l1YaY'~hall beremoveCl imniediafely.' <br />4.DAILY RESTORATION:'Pri,}ate driveWays'ariitoad intersections shall be restored daily. <br />5.WEATHER-TIGHT CONDmONS:,'All:b;enches shall he,filled and ccimpact'ed,.ditches and other <br />drainage facilities regarded and opened,.andthe entire work area restored t~'weather-tight condition prior to ', <br />any rain.',,,",:,'".'",.',::,',,,,..',.,..',' <br />,---- <br />'.:'.. <br />-,.~.." <br />"..'.' <br />.',.:.'...;.':.''. <br />..... <br />...":. <br />,, <br />F;\PERMIrS COUNTER\sClcnl provisions\Wmler Wea.tbetPtovUi0r:s-dD~'
The URL can be used to link to this page
Your browser does not support the video tag.