My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600000 thru PS-1600500_ - PS-1600086
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1600000 thru PS-1600500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600000 thru PS-1600500_ - PS-1600086
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:46:07 PM
Creation date
6/7/2016 2:12:00 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1600086
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1600000 thru PS-1600500
Year2
2016
Address
RIVER RD AT BNSF RAILROAD
Application
CITY OF ESCALON
Supplemental fields
APN
PS-1600086
Cross Ref
PWP7110005
CrossRef
PWP7110005
Type (2)
Encroachment Permit (EP)
Zip
95320
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
SPECIAL PROVISIONS.,....-,:" <br />Winter Weather Utility Work <br />.'... <br />1.SUPERVISION.:The utility compaJ;ly(penDitt~e)sh.all~sh full~time sUpervision of all work to insure <br />.compliance with the permit provision..:'..'..,..'.'.'.'. <br />2.START OF WORK:No work within fue'Ccunty.ri"ght-of-way shall be st:Uted:until the utility.company <br />representative has made an evaluation of weather-conditions and has determined the work can be . <br />'"accomplished under the provisions of the.permit.... <br />3.CLEAN PAVEMENT:'Dirt and mud sl;mllno:tbe d~p~sit~d'on th~pavement outside the area of work, <br />and if inadvertently tracked {Jnto..the road tril."y:~l1Y.ay"~hall bNeIiloved.ill;mi.ediateIy... <br />4.DAILY RESTORATION:'Pri-iJ-atedrivev/ays:ariitoad intersections shall be restored daily. <br />5.WEATHER-TIGHT CONDITIONS:..All:b;euches shan be filled and compacted,ditches and other . <br />drainage facilities regarded and opened,and "the.entire work are(l.restored t~'weather-tight condition prior to ..any~:"..'...".:.' <br />'.'....,"". <br />.--- <br />:',. <br />." <br />"'...... <br />"." <br />'.'..: <br />."..:.':.''. <br />..... <br />." <br />..",. <br />.... <br />'.. <br />'. <br />..," <br />\PERMITS COUN1ER\generaI pl"ovisions\WinterWca1berProvisions..doex:'•.
The URL can be used to link to this page
Your browser does not support the video tag.