My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600000 thru PS-1600500_ - PS-1600353
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1600000 thru PS-1600500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600000 thru PS-1600500_ - PS-1600353
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:46:51 PM
Creation date
6/7/2016 2:14:49 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1600353
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1600000 thru PS-1600500
Year2
2016
Address
S/S OXFORD WY 1000' E/O GRANGE
Application
HALEY CONTRACTING
Supplemental fields
APN
PS-1600353
Cross Ref
PWP7110005
Type (2)
Encroachment Permit (EP)
Zip
95205
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
SPECIAL CONDITIONS FOR <br />ENCROACHMENT PERMIT <br />1.Traffic Control per MUTCD <br />2.Maintain traffic controls for all roads.Traffic control delays shall not exceed 15 minutes. <br />Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br />plated.During working hours,two-way traffic control shall be maintained with one lane open and <br />appropriate f1aggers.The contractor shall submit traffic control plans for all signing,detours,and <br />any lane closure impacting County right-of-way.Traffic control plans shall be submitted two <br />weeks prior to the closure date. <br />3.'Access to all properties shall be maintained at all times except when work is occurring at the <br />access point.Minimal delays will be allowed to provide access within the work zone area. <br />Driveway access shall be fully restored at the end of each workday.Driveways disturbed by the <br />contractor shall be replaced with in-kind or better materials. <br />4.Residents and businesses shall be notified in writing,as approved by the County,48 hours in <br />advance of any impacts to their access. <br />5.Any areas where parking is to be restricted shall have signs noting the restrictions in place at <br />least 48 hours in advance.. <br />6.Existing fe,nces shall not be removed without written consent of the property owner.Such consent <br />shall be submitted to the County pri()r to the removal.Fences removed shall be restored with in-. <br />kind or better materials.Restored fences shall not encroach into County right-of-way. <br />7.Work shall not be permitted within the San Joaquin County right-of-way between November 1 and <br />March 31 without prior authorization from the San Joaquin County Field Engineering Division, <br />contact them at 209-953-7421. <br />8.Final paving for trench repair or road resurfacing shall be per Caltrans'specifications and shall <br />not occur between November 1 and March 31,without prior authorization from the San Joaquin <br />County Field Engineering Division,contact them at 209-953-7421. <br />9.All destroyed or obliterated pavement markings must be replaced in kind by the permittee.Typical <br />pavement markings include but not limited to lane lines,centerlines,stop and stop ahead <br />legends,limit lines,rais~d pavement markers and miscellaneous delineators. <br />10.The Permittee is responsible for the preservation of survey monuments located within the area of <br />work herein permitted.Prior to the start of construction,survey monuments that potentially may <br />be disturbed shall be located and referenced by a Licensed Land Surveyor,and a Corner Record <br />filed with the County Surveyor.Any Survey Monuments disturbed during the course of <br />construction shall be reestablished by a Licensed Land Surveyor and another Corner Record filed <br />with the County Surveyor.(LandSurvey()rs'Act Section 8771) <br />11.All pipe and pipeline related facilities including,but not limited to,valves,utility boxes and vaults, <br />and frames and covers shall be maintained by Haley Construction Inc,including any facilities that <br />are abandoned in place.Haley Construction Inc shall be responsible for any and all costs
The URL can be used to link to this page
Your browser does not support the video tag.