Laserfiche WebLink
.•.•..'~.•.~:.,...:,.....•'".~.•.'-.,,~.':\~"......~~~':-"'.•.,,,'...\ <br />,,,''''NOTES: <br />1.If the distance between cross-cuts are ,less then 150'the entire area between <br />corss-cuts shall be planed and resurfaced with one (1)inch of Asphalt Concrete. <br />2.The resurfacing requirements shall be in addition to County Standard Drawing No.R-29.. <br />3.Resurfacing for Bell Holes shall meet these'.requirements.If excavation occurs within <br />the shoulder or lane,only thot area shall lie resufaced'as shown.. <br />4.If cross-cutting is performed on Local Roads at intervals less then 150'a .Seal <br />Coat.for that.half of the roadway containing the trench can be 'used in lieu of <br />resurfacing.Section 2-5.03 (B-:-2)., <br />-0 <br />C°2~vv~L..u~UoC,'t v °:::JcUena.•.. <br />01-c (5:E~-E.en en'x Q)«Q)g ..•.. <br />w't°C:::J.c.2(J)uje.~ <br />l' <br />ll..W <br />jalftr <br />Date <br />R-36 <br />Approved by: <br />NO.1 Revision Description <br />-'-fo;cU <br />.••••.•'Q).-enE2::Jo <br />TRENCH CUTTING POUCYCROSSCUTTINGOFCOUNTY,ROADWAYS <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC iVORKS <br />Dole:MAY 20151Std.Owg.No. <br />~. <br />Wor~for YOU