Laserfiche WebLink
NOTES: <br />1.If the distance between cross-cuts are less then 150'the entire area between <br />corss-cuts shall be planed and resurfaced with one (1)inch of Asphalt Concrete. <br />2.The resurfacing requirements shall be in addition to County Standard Drawing No.R-29. <br />3.Resurfacing for Bell Holes shall meet these'requirements.If excavation occurs within <br />the shoulder or lane,only that area shall be resufaced as shown. <br />4.If cross-cutting is performed on Local Roads at intervals less then 150'a Seal <br />Coat for that half of the roadway containing the trench can be used ih lieu of <br />resurfacing.Section 2-5.03 (B-2). <br />, <br />Date <br />IRlg3~ <br />Approved by:jalPr <br />NO.1 Revision OescriDtion <br />"lJ <br />Co '".•..~'""'~....u~Uo ct"'O::>cUrna.•.. <br />",..c:0c~..c:;:;~c.rn rn.x Q)« <br />'"u0••... <br />'"t aC::>..c:ornuj~'~ <br />-r <br />0-W <br />,-.1l'~'Ou <br />••••rn._rnEe:Jo <br />CoY <br />,~I'*',~I0,~I"',(/)1 <br />I <br />TRENCHtuniNG POLnleYCROSSCUTTINGOFCOUNTYROADWAYS <br />COUNTY OF SAN JOAQUiN <br />DEPARTMENT OP PUBUC WORKS <br />-Ool-e:-MA-Y-20-15IStd.Dwg.No. <br />~JV;~&~ <br />W01'kUlg for YOU <br />Paved