Laserfiche WebLink
See Note 1 Below <br />See Note 2 Below <br />Compact in 12"maxlayerstoaminrelative <br />compaction of 95%under pavement and <br />90%outside pavement. <br />Var <br />3'-0"t <br />10"Min <br />r6"Min <br />,(Typ) <br />10" <br />Existing' <br />Pavement <br />10"Min <br />/~/ <br />~~>v:<C t'24"ompoc In max <br />~layers to 0 min relative <br />~compoction of 85%, <br />Compact in 6"layerstoaminrelativecompactionof90%, <br />OD+20"Min OD+20"Min <br />RIGID CONDUIT FLEXIBLE CONDUIT <br />NOTES: <br />1.New pavement shall be 1"thicker than existing pavement,minimum <br />of 0.25 Ft.New base shall be 1"thicker than existing base,min of 0.50 Ft. <br />2.Select native material or imported granular 'material as approved by the Director <br />of Public Works.Backfill with materials equal to or better than the existing <br />pavement and base in quality. <br />3.Relative compaction of materiols shall be tested in accordance with <br />the State of California,Dept.of Transportation Testing Manuals,test <br />method No.California 216 or 231. <br />4.All existing pavement shall be neatly cut to line prior to trench excavation. <br />5.Jetting or ponding will be permitted within the street right-of-way with <br />a 3 year bond,when approved by the Director of Public Works. <br />6.When shown by soil composition and compactability,ninety percent (90%) <br />compaction may be used,when approved by the Director of Public Works. <br />7.Special bedding and backfill requirements may be shown on the plans or <br />specified in the special provisions. <br />No.Revision Descri tion Date <br />TYPICAL TRENCH BACKFILL ~m~.~ <br />4,~ <br />wOrking for YOU <br />Approved by: <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />Dale:DEC 2014 Std,Dwg.No.R.29