My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1502001 thru PS-1502500_ - PS-1502169
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
PS-1502001 thru PS-1502500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1502001 thru PS-1502500_ - PS-1502169
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:38:36 PM
Creation date
6/9/2016 10:05:44 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1502169
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\PS-1502001 thru PS-1502500
Year2
2015
Address
E/S VAN ALLEN RD S/O HWY 4
Application
PACIFIC GAS & ELECTRIC-SACRAMENTO
Supplemental fields
APN
PS-1502169
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
SPECIAL PROVISIONS . <br />Winter Weather Utility Work <br />1. SUPERVISION.: The utility company(periiittee) shall furnish fall:-time' supervision of all work to insare <br />compliance with the permit provision. <br />2. START OF WORK: No work within the County.right-of-way shall be started until the utility company <br />representative has made an evaluation ofweather conditions and has determined the work can be <br />accomplished under the provisions of the permit. <br />3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the pavement outside the area of-work, <br />and if inadvertently tracked onto the road travel way shall be removed immediately. <br />4. DAILY RESTORATION: Private driveways'and toad intersections shall be restored daily. <br />5. WEATHER-TIGHT CONDITIONS: All trenches shall be.filled and compacted, ditches and other <br />drainage facilities regarded and opened, and the entire work area restored to weather-tight condition prior to . <br />any rain. <br />F:\PERMITS COUNTEK\general provisions\Winter WeatherProvisions.docx'
The URL can be used to link to this page
Your browser does not support the video tag.