Laserfiche WebLink
SPECIAL. PROVISIONS <br />Winter Weather Utility Work <br />1. SUPERVISION: The utility company(permittee) shall furnish full=time supervision of all work to insure <br />compliance with the permit provision. <br />2. START OF WORK: No.work within the County.right-of-way shall be started until the utility company <br />representative has made an evaluation ofweather conditions and has determined the work can be <br />accomplished under the provisions of the permit. <br />3. CLEAN PAVEMENT: Dirt and mud shall not be deposited'on the pavement outside the area of work, <br />and if inadvertently tracked onto-'the road travel way'shalr be removed immediately. <br />4. DAILY RESTORATION: Private driveways and.road intersections shall be restored daily. <br />5. WEATHER-TIGHT CONDITIONS: All.trenches shall be.filled and compacted,.ditches and other <br />drainage facilities regarded and opened, and the entire work area restored to weather-tight condition prior to . <br />any rain. <br />FAPERMITS COUNTER\general provisionslWinterWeather Provisions.&o