My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600501 thru PS-1601000_ - PS-1600563
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1600501 thru PS-1601000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600501 thru PS-1601000_ - PS-1600563
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:48:59 AM
Creation date
6/24/2016 1:31:21 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1600563
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1600501 thru PS-1601000
Year2
2016
Address
E/S WAGNER AV 394'N/O HORNER AV
Application
PACIFIC GAS & ELECTRIC - SACRAMENTO
Supplemental fields
APN
PS-1600563
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
SPECIAL PROVISIONS...'......,:" <br />Winter Weather Utility Work <br />,.' <br />1.SUPERVISioN:The utility compaify (per)l1itte.e)shall furnis"hfull~time supervision of all work to insure <br />.compliance with the permit provision..''.', <br />2.START OF WORK:No work within theCounty.rfght-of-way shall be stinted until the utility company <br />representative has made an evaluation of weather conditions and has determined the work can be ' <br />"accomplished under the provisions of the permit.. <br />3.CLEAN PAVEMENT:'Dirt and mud sl;J.allno:tbe d~p~;it;;d..on the pavement outside the area of work, <br />and ifinadvertently tracked onto..the-road trii)l~l\yaf~hall bereIlJ.ove~in;rniediafely.. <br />4.DAILY RESTORATION:'Pri,jate drive'WaYs'arid toad intersections shall be restored daily. <br />5.WEATHER-TIGHT CONDITIONS:.'AJ1lJ;ei:J.chessblill be.filled and compacted,.ditches and other . <br />drainage facilities regarded and opened,and 'the entire work ar~restored t~'weather-tight condition-prior to ..any~...:'.....".....'...".:.'..'",.". <br />,--...... <br />-,.:'.' <br />'. <br />".. <br />.-,..... <br />." <br />"." <br />•".:•t.....:.''. <br />..... <br />.":. <br />". <br />.."
The URL can be used to link to this page
Your browser does not support the video tag.