My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600501 thru PS-1601000_ - PS-1600714
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1600501 thru PS-1601000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600501 thru PS-1601000_ - PS-1600714
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:50:34 AM
Creation date
6/24/2016 1:49:20 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1600714
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1600501 thru PS-1601000
Year2
2016
Address
HWY 99 FRINTAGE N/O MORADA LN
Application
AT&T - FRESNO
Supplemental fields
APN
PS-1600714
Cross Ref
PWP730079
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
SPECIAL PROVISIONS <br />.,:'. <br />WinteJ;Weather Utility Work <br />...'. <br />1.SUPERVISioN:The utility compalfy (per,IDitte.e)shall furniSh ful1~timesUpervision of all work to"insure <br />.compliance with the permit provision.'......."...,',",. <br />2.START OF WORK:No work withintheCounty.rfght-of-way shall best~ed until the utility company <br />representative has made an evaluation of weather'conditions and has determined the work can be' <br />"accomplished under the provisions of the permit . <br />3.CLEAN PAVEMENT:'Dirt and mud sl;mllnot be d~p~;it;xron the pavement outsIde the area of work, <br />and if inadvertently tracked onto ..theroad tril.yel'Yay"~halJ:bereIilaved imniediafely.. <br />4.DAlLY RESTORATION:'Pri"iiatedrfveWays'ariitoad intersections shall be restored daily. <br />5.WEATHER-TIGHT CO$mONS:.'AJI:h;euches shitIIbe filled andcompaeted,.ditches and other . <br />drainage facilities regarded and opened,and-the 'entire work area restored t~.weather-tight condition.prior to ..arryrain.'......'".".,"......".:.'..'",..',' <br />.----- <br />'.:',. <br />-...:." <br />".. <br />".,""."'..-:.'~.'.. <br />......'. <br />....:. <br />.... <br />'.. <br />) <br />.."
The URL can be used to link to this page
Your browser does not support the video tag.