Laserfiche WebLink
SPECIAL PROVISIONS , <br />Winter Weather Utility Work <br />1. SUPERVISION: The utility company(per.iddtte6) shall furnish full=time supervision ofall work to insure <br />compliance with the permit provision. <br />2. START OF WORD: No work within the'County.right-of-way shall be started:until the utility company <br />representative has made an evaluation of weather conditions and has determined the work can be <br />accomplished under the provisions of the permit. <br />3. CLEAN PAVEMENT: Dirt and mud shall not be deposited*on the pavement outside the area of work, <br />and if inadvertently tracked onto the road travel wayshali mberemovedimmediately.. <br />4. DAILY RESTORATION: Private driveways.and road intersections shall be restored daily. <br />5. WEATHER-TIGHT CONDITIONS: All.trenches shall be.filled and compacted,ditches and other <br />drainage facilities regarded and opened, and the-entire work area restored to weather-tight condition prior to . <br />any rain. <br />F-Tmuv rS COLTI,=\genera]provisions%interWeatherProvisions.doox'