Laserfiche WebLink
If the distance between cross-cuts are less then 150'th,e entire ai-eo between <br />corss-cuts shall be planed'and resurfaced with one (1)inch of Asphalt Concrete, <br />The resurfacing requirements sholl be in addition to County Standard Drawing No,R-2$, <br />Resurfacing for Bell Holes sholl meet these requirements,If excavation occurs within <br />the shoulder or lone,only that oreo shall be resufoced as shown, <br />If cross-cutting is performed on Local Roads at intervals less then 150'a Seal <br />Coat for that half of the roadway containing the trench can be used in lieu ofresurfacing,Section 2-5,03 (B-2), <br />2 <br />4, <br />NOTES: <br />1 , <br />I <br />i <br />'D <br />e CDo~~CDCD~L <br />()~()o e4_(I)0LeUiii0""en..£:ac.~...c <br />~'3:g-'x ill « <br />CD(),<- <br />o °CD'tC::l.s::o UJ ()-Q)c1L_ <br />1 <br />~I1II II,, <br />I ,Ij;/;.c :/-'/::%;.;j;/;::; <br />-- <br />~~;.c,, <br />~I ,II,I , <br />21 I II0,,~I I I 1ICD,,VJr ,I wI,,,;.c;.c <br />~" <br />'/;:: <br />~;.c ~;.c;.cI,1Ii,,II <br />LTa <br />L <br />To <br />oT <br />o <br />L <br />I <br />L <br />Paved Shoulder---t4 <br />( <br />(Lw <br />•Approved by: <br />jiLl Jj)r <br />No.Revision Oeser!Han Dote