My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1601501 thru PS-1602000_ - PS-1601672
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1601501 thru PS-1602000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1601501 thru PS-1602000_ - PS-1601672
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:53:29 AM
Creation date
8/9/2016 11:19:39 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1601672
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1601501 thru PS-1602000
Year2
2016
Address
N/S OF PRINCETON AV 298'E/O MARINE AVE
Application
PACIFIC GAS & ELECTRIC - STOCKTON
Supplemental fields
APN
PS-1601672
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
2-5.04 <br />2.Cross-cutting is allowed under the same conditions as Section 2- <br />5.02(B)(3).If cross-cuts occur within the .[50 feet minimum interval, <br />resurfacing may be substituted with a slurry seal for that half of <br />the roadway (See County Standard DI-awing No.R-36). <br />Exceptions <br />Excavation is prohibited in newly renovated County roadways for three (3) <br />years after a notice of completion has been filed for a roadway improvement <br />project,or a new roadway has been accepted.The Director of Public Works <br />may approve exceptions that are in the best interest of the public,including <br />but not limited to: <br />A.An emergency that endangers life or propel-ty. <br />B.For I.epair or modification to prevent interruption of essential utility <br />service. <br />C.For relocation work that is mandated by County,State or Federal <br />law. <br />D.FOI-service for buildings where no othel.reasonable means of <br />providing service exists. <br />E.For potholing to verify utility depth or location. <br />F.For tl-ench[ess excavations greater than three feet in depth of cover <br />over the utility facility,and not requiring a significant surface <br />Incision greater than industry bore pit standards. <br />Exceptions must be requested and submitted in writing to the Department. <br />Payment of a nonrefundable processing fee is also required.Exceptions <br />will be reviewed using the Departments Action Approval process,which <br />requires the recommendation of a Deputy Director. <br />43
The URL can be used to link to this page
Your browser does not support the video tag.