Laserfiche WebLink
-_..__._--~---------._---_._. <br />NOTES: <br />1.If the distance between cross-cuts are less then 150'the entire area between <br />corss-cuts shall be planed and resurfaced with one (1)inch of Asphalt Concrete. <br />2.The resurfacing requirements shall be in addition'to County Standard Orawing No.R-29 .. <br />3.Resurfacing for Bell Holes shall meet these requirements.If excavation occurs within <br />the shoulder or lane,only that area shall be resufaced as shown. <br />4.If cross-cutting is performed on Local Roads at intervals less then 150'a Seal <br />Coat for that half of the roadway containing the trench can be used in lieu of <br />resurfacing.Section 2-5.03 (B-2). <br />1 <br />0..W <br />-.i <br />10;'to <br />4-'rJJ.-rJJE2.:Jo <br /><cJlI <br />0..W <br />F 1 I !, <br />I <br />,IT <br />0I <br />T <br />0~ <br />,,~I I II'%0,, <br />21 I II0,,~I I I "]IlV,, <br />(1)/I II,,• <br />~ <br />I I <br />i I i, <br />To <br />LTo~L <br />Paved Shoulder ~ <br />..1 <br />Approved by: <br />No.Revision Descri Han Dote <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />Date:MAY2015 Std.Dwg.No.