Laserfiche WebLink
NOTES: <br />1.If the distance between cross-cuts are less then 150'the entire area between <br />corss-cuts shall be planed and resurfaced with one (1)inch of Asphalt Concrete .. <br />2..The resurfacing requirements shall be in addition'to County Standard Drawing No.R-29 .. <br />3.Resurfacing for Bell Holes shall meet these requirements,If excavation occurs within <br />the shoulder or lane,only that area shall be resufaced as shown. <br />4,If cross'-cutting is performed on Local Roads at intervals less then 150'a SeQI <br />Coat for that half of the roadway containing the trench can be used in lieu ofresurfacing.Section 2-5.03 (B-2), <br />'D <br />C "o +'~",,~Lu~UoC4-,,0LCU050 <br />if!:t:: <br />(J>--C 0c:-!:::...c.-:so 0. <br />~if!.x Q)« <br />"U4-o 0,,'t: <br />C05..coif!uCLe.~J <br />1 <br />~I <br />[Lw <br />LTCo <br />L <br />r ! <br />I !II,IT <br />0- <br />,,~I ,II"!Io;,2/, <br />1I.0z', <br />"I ,I ~I",,(/)1 ,I wI,, <br />i I i,, <br />TCo <br />.LTCoI <br />Paved Shoulder---t"1 <br />No.Revision Descri Han Date <br />Approved by:jalflr <br />COUNTY OF SAN JOAQUIN <br />DEP AR1MENT OF PUBLIC WORKS <br />Date:MAY2015 Std.Dwg.No,._--_._-----------_._.----_.-._.__.__._.._------