Laserfiche WebLink
See Note 1 Below <br />3'-0"L <br />Var <br />10"Min10" <br />Existing <br />Pavement <br />10"Min <br />,,\"See Note 2 Below;;Compact in 12"max <br />~layers to a min relative/compaction of 95%,,\"under pavement and <br />~90%outside pavement. <br />C<Ct.24"ompac In max~layers to a min relative <br />~compaction of 85%. <br />Compact in 6"layerstoaminrelative <br />compaction of 90%. <br />6"Min-j <br />(Typ) <br />.-!.,..5",.',.:.'.":r./~o3f~>--------~========vr ~ <br />~"-00/2 ~"-:::.:;//,,"/~/~~ <br />00+20"Min <br />00 <br />+20"Min <br />RIGID CONDUIT FLEXIBLE CONDUIT <br />NOTES: <br />1.New pavement shall be 1"thicker than existing pavement,minimum <br />of 0.25 Ft.New base shall be 1"thicker than existing base,min of 0.50 Ft. <br />2.Select native material or imported granular material as approved by the Director <br />of Public Works.Backfill with materials equal to or better than the existing <br />pavement and base in quality. <br />3.Relative compaction of materials shall be tested in accordance with <br />the State of California,Dept.of Tronsportation Testing Manuals,test <br />method No.California 216 or 231. <br />4.All existing pavement shall be neatly cut to line prior to trench excavation. <br />5.Jetting or ponding will be permitted within the street right-of-way with <br />a 3 year bond,when approved by'the Director of Public Works. <br />6.When shown by soil composition and compactability,ninety percent (90%) <br />compaction may be used,when approved by the Director of Public Works. <br />7.Special bedding and backfill requirements may be shown on the plans or <br />specified in the special provisions. <br />Approved by: <br />TYPICAL TRENCH BACKFILL <br />No.Revision Descri ticn Date <br />WOrking for YOU <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />Dale:DEC 2014 Std.Dwg.No.R-29