My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1601501 thru PS-1602000_ - PS-1601724
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1601501 thru PS-1602000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1601501 thru PS-1602000_ - PS-1601724
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:53:43 AM
Creation date
8/9/2016 11:24:03 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1601724
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1601501 thru PS-1602000
Year2
2016
Address
N/S PELTIER RD 563'W/O TRETHE WAY RD
Application
PACIFIC GAS & ELECTRIC -STOCKTON
Supplemental fields
APN
PS-1601724
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
SPECIAL PROVISIONS.;'....','.::. <br />Winter Weather Utility Work <br />.'.'. <br />1.StJPERVISloN:The utility comp83fY(pe\nllttee)s4all fumisn full°time sUpervision of all work torffisure <br />,compliance with the permit provisIon,....." <br />2.START OF WORK:No work withintheiCountyright-of-way shall be sfurteduntil the utility.company <br />representative has made an evaluation of weather conditions and has d(:termined the-work can be' <br />"accomplished under the provisions of the'permit ', <br />3.CLEAN PAVEMENT:'Dirt and mud sl,mIlnot be d~p~sit~d'on th~pavement outside the area of work, <br />and if inadvertent~y tracked onto,.theroad trii;rd 'YaY'~haIl be'removed imDiediately.. <br />4.DAILY RESTORATION:'Pri-iTatedrive'Ways'aJi.droad intersections shall be restored daily. <br />5.WEATHER-TIGHT CONDITIONS:,'All.lr:enches shill be,filled andccimpaeted,.ditches and other , <br />drainage facilities regarded and opened,and-the -entire work area restored t~'weather-tight condition prior to ',any~",,:","',.:.. <br />'.'..","". <br />'.:',. <br />" <br />~..~...:." <br />".. <br />.',.,."..:.'~..'. <br />..... <br />.'.:. <br />.." <br />," <br />".,'.' <br />",
The URL can be used to link to this page
Your browser does not support the video tag.