Laserfiche WebLink
NOTES: <br />1.If the distance between cross-cuts are less then 150'the entire area between <br />corss-cuts shall be planed and resurfaced with one (1)inch of Asphalt Concrete. <br />2.The resurfacing requirements shall be in addition to County Standard Drawing No.R-29 .. <br />3.Resurfacing for Bell Holes shall meet these requirements.If excavation occurs within <br />the shoulder or lane,only that area shall be resufaced as shown. <br />4.If cross'-cutting is performed on Local Roads at intervals less then 150'a SeQI <br />Coat for that half of the roadway containing the trench can be used in lieu of <br />resurfacing.Section 2-5.03 (B-2). <br />'D <br />C '"o +'~'"'"~Lo~OoC't:<])0Olco <br />[f)0:t:oo.£:0c~..c.-30 a-t)[f)'x Q)<::( <br />"'[)4-o 0",'t:C::J.co[f)()9--Q)CL._ <br />-'l. <br />1 <br />Ilw <br />Approved by:jalftr <br />DateNo.Revision Descrihtion <br />T~lEllIl~M CllJHffllllrillFOUeV.CROSS ClLlITNWltGJOIFrG[))l1Jj~nr~[]JU)JWA\fS <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBUC WORKS <br />IDate:MAY2D15 Std.Dwg.No.lRlo~lW----..._.-------------_.-..