GENERAL PROVISIONS
<br />GOVERNING INSTALLATION OF SUBSURFACE STRUCTURES AND PIPELINES WITHIN COUNTY ROAD RIGHTS-OF-WAY
<br />PUBLIC CONVENIENCE AND SAFETY:
<br />A Before obstructing any private driveway entrance or County road traveled way with a trench,spoil bank,equipment or other barrier permitted for any
<br />prolonged period of time,the Pennittee shall notify the known users of the respective thoroughfare(s)involved,and shall provide access for vehicular and
<br />pedestrian traffic to and from the road.
<br />1.Unless otherwise permitted,all work shall be conducted in such a manner that no less than olle lane of the existing County road traveled way will
<br />be maintained open to public traffic during working hours in a smooth and safe riding condition(s).Two lanes shall be open after working hours.
<br />2.In cases where road closure is pennitted,the permission to close the road will be granted under the condition that the Permittee notifY the
<br />following persons and/or agencies of the time,the period of closure,and the detour route at least twenty~four (24)hours prior to said road closure,
<br />a.The County of San Joaquin Public Works Department d.:The local fire district
<br />b.The County of San Joaquin Sheriff's Office e.i The local school district
<br />c.The local postal service f.I The local residents involved
<br />B.Should hazardous conditions relative to the installation operations warrant flagnien,as many capable flagmen as may be necessary shall be provided by the
<br />Pennittee and stationed in advance of work to warn and direct traffic.Ic.Lights,signs and barricades shall be furnished,erected and maintained by the Pennittee for the adequate warning and convenience of the public,with
<br />particular attention to be taken in this regard after dark.I
<br />D.Any excess dirt and/or debris which might be a hazard to either automobile or pvdestrian traffic,uncontrollable by lights,signs and barricades,shall be
<br />removed from the jobsite daily.I
<br />STRUCTURES:I
<br />IA.Walls of structures shall be such quality and strength that they will resist all pressures and will not crack or be deformed in such a way as to create a hazard
<br />or maintenance problem at any time.Therefore,the minimum structural requireinents for concrete pipe placed under county road rights~of~way shall
<br />conform to thc following American Association of State Highway and transportation Officials (AASHTO)designations.
<br />J.For concrete pipe up to and including thirty~three inches (33")inside diameter,extra strength concrete conforming to AASHTO Designation M
<br />170M.
<br />2,For concrete pipe thirty~six inches (36")inside diameter and larger,reinforced concrete pipe can fanning to AASHTO Designation M 170M Class1IL
<br />3.Plastic pipe conforming to AASHTO Designation M294.
<br />B.All concrete pipe joints with County road rights~of-way shall be sealed against leakage and/or infiltration with rubber gasket in conformance with Section
<br />65-1 :06 of the California Standard Specifications,or with other methods as may be pennitted under the Special Provisions.
<br />C.Cast-in-place concrete pipe,vitrified clay pipe,spiral welded steel pipe,or corrugated aluminum alloy pipe shall not be installed within the County road
<br />rights~of~way unless specifically so stated in the Special Provisions,and only under the conditions as provided.
<br />D.All structures to be buried within the County rights-of-way shall be set at such elevations as to allow minimum coverage of thirty inches (30")to the
<br />centerline of the roadways and twelve inches (12")at the bottoms of borrow ditches each side ofthi;:roadways.The depths of structures shall be established
<br />below a flat plane extending across the rights-of-way,no part of which shall extend above the elevations stated above;manholes,lampholes,valves,etc.not
<br />included.Future surface elevations shall bc anticipated as nearly as possible and structure elevations shall be established for future adjustments accordingly.
<br />E.The County hereby reserves the right to specify in the Special Provisions the gage and surface treatment of any galvanized corrugated metal pipe that is to be
<br />installed.
<br />F.All longitudinal utility facilities are to be established (and dimensioned on sketches)from surveyed centerline of road right-of-way,not from right-of~way
<br />(border)lines.
<br />REPAIRS OFTHE COUNTY RIGHT-OF-WAY:
<br />A
<br />B.
<br />c
<br />D.
<br />E.
<br />F.
<br />G.
<br />H.
<br />I
<br />J.
<br />All excavations shall be backfilled and compacted immediately after work therein has been completed.
<br />Trenched shall not be left open farther than 300 feet in advance of pipe laying operations,or 200 feet to the rear thereof,unless otherwise permitted by the
<br />Engineer.I
<br />Unless otherwise permitted under the Special Provisions,backfill shall be placed and mechanically compacted in such a manner that the relative compaction
<br />throughout the entire fill within the County road right~of-way shall conform to the percentages of compaction as shown on the Trench detail.
<br />Backfill material shall be placed in horizontal uniform layers not to exceed in thickness,before compaction,0.67 foot in the bedding region,one -foot where
<br />90%compaction is required,and two-feet where 80%compaction is required.I
<br />No portion of the excavation(s)shall be compacted by ponding orjetting unless a maintenance bond is provided.
<br />Gravel backfill material shall be utilized only where specifically so stated on th~face of the pennit.It shall be compacted by means of a high-frequency
<br />internal vibrator,the compactor to be a size and type approved by the Engineer.I Points of compaction shall not be greater than 18"centers and to the full
<br />depth of the lift.i
<br />All pavements,curbs,gutters,sidewalks,borrow ditches,pipes,head walls,road signs,trees,shrubbery,and/or other pennanent road facilities impaired by
<br />or as a result of construction operations at the construction site(s)occupied by niaterials and/or equipment,shall be restored immediately upon backfilling of
<br />the excavation to the original grades and cross sections,and to a condition as good as,or better than existing prior to construction.
<br />All surfacing materials of roadways and driveway approaches cut or damaged by or as a result of construction operations,shall be replaced within ONE
<br />WEEK following the backfilling of excavation,weather permitting,with compa~ted layers of surfacing materials at least as thick as the existing,and no less
<br />than two inches (2")of asphalt concrete over six inches (6")of aggregate base,both as specified below.
<br />1.Asphalt Concrete:Combined mineral aggregate shall conform to the :quality and gradation requirements for Type "B"one-half inch(1l2)
<br />maximum aggregate,coarse or medium gradation as specified in Section 39 of the California Standard Specifications.The bituminous binder to
<br />be mixed with mineral aggregate shall be paving asphalt having (Grade PO 64-10),unless othenvise directed by the Engineer.Placement of
<br />asphalt concrete surfacing shall conform to the applicable provisions'of Section 39 of the California Standard Specifications.
<br />2.Aggregate Base:Combined mineral aggregates shall confonn to the 'quality and the grading for three~quarter inch (3/4")maximum size
<br />aggregate Class 2 Aggregate Base specified in Section 26 of the California Standard Specifications.
<br />Before acceptance of repairs to the County road rights-of-way,all unsightly and detrimental dirt,dust and/or debris shall be removed and the construction
<br />areas left in a neat and presentable condition(s),
<br />1.lfnecessary,County road traveled way and driveway pavements shall be washed with water to remove dirt and dust.
<br />2.Driveway approaches and field entrance pavements damaged by equipment or spoil banks shall be repaired as directed by the Engineer.
<br />Upon request by the County,any settlement,sagging of surface,or cracking of pavement shall be repaired immediately by and at the sole expense of the
<br />rennittee for a period of one year following acceptance of the work.
<br />X\ENCROACH.l\.ffiNTS\General Provisions (Encroachment Permits)\Winter Weather Provisions docx
|