My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1602001 thru PS-1602500_ - PS-1602108
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1602001 thru PS-1602500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1602001 thru PS-1602500_ - PS-1602108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:55:49 AM
Creation date
8/9/2016 2:48:51 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1602108
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1602001 thru PS-1602500
Year2
2016
Address
W/S EL DORADO ST 282'N/O LOWELL ST
Application
PACIFIC GAS & ELECTRIC -STOCKTON
Supplemental fields
APN
PS-1602108
Cross Ref
PWP7110005
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
SPECIAL PROVISIONS.".'.'..' <br />.::'. <br />Winter Weath-erUtility Wark <br />.." <br />.'"... <br />1.SUPERVISION:The utility compalfy (perIDitte:e)shall furnisll full°tiIne supervision of all work to insure <br />.compliance with the permit provision. <br />2.START OF WORK:No.work within thli .County.rfght-of-way shall be st:rrted until the utility company <br />representative has made an evaluation of weather conditions and has determined the work can be . <br />"accomplished under the provisions of the.permit.. <br />3.CLEAN PAVEMENT:Dirt and mud sl;J.allno:tbe d~posited.on the pavement outside the area of work, <br />and if inadvertently tracked onto..the road tr,rv:elVjaj."~hallbe.removed in;m:i.ediately. <br />4.DAILY RESTORATION:.Pri+ate driveWays.aJi.dtoad intersections shall be restored daily. <br />5.WEATHER-TIGHT CO:NDffiONS:.All:b;enches sh8.11be.:filled and compacted,.ditches and other . <br />drainage facilities regarded and opened,and the .entire work area restored t~.weather-tight condition.prj.or toany~...........".:.' <br />.----. <br />"...:." <br />"',.: <br />..... <br />...;. <br />F;\PERMITS COUNTER\gen~provjsions\Wint~Wcatbcr Provisio~.doc:x:.
The URL can be used to link to this page
Your browser does not support the video tag.