My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1602001 thru PS-1602500_ - PS-1602110
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1602001 thru PS-1602500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1602001 thru PS-1602500_ - PS-1602110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:55:55 AM
Creation date
8/9/2016 2:48:53 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1602110
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1602001 thru PS-1602500
Year2
2016
Address
E/S PINASCO RD 1,096'N/O HWY 26
Application
PACIFIC GAS & ELECTRIC -STOCKTON
Supplemental fields
APN
PS-1602110
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
SPECIAL PROVISIONS.,".'... <br />Winter Weather Utility Work <br />... <br />.'" <br />1.SUPERVISioN:The utility compalfy (pelJ)ii.ttee)shall furnish full°time supervisiori.of all work to insure <br />.compliance with the permit provision......',"'., <br />2.START OF WORK:No work within thciCounty.right-of-way shall be st8rted:until the utility company <br />representative has made an evaluation of weather conditions and has determined the-work can be. <br />"accomplished under the provisions of the permit.. <br />3.CLEAN PAYEMENT:.Dirt and ~ud sku not be d~posited.on the pavement outside the area of work, <br />and if inadverten4y tracked onto..the road tra)7~lVf.af~haltbereto.oved i:o;Iniediately.. <br />4.DAILY RESTORATION:.Pri\iate clriveways:aitd:toad intersections shall be restored daily. <br />5.WEATHER-TIGHT CONDITIONS:..All.b;enches shall be filled and compacted,ditches and other . <br />drainage facilities regarded and opened,andthe .entire work area restored t~.weather-tight condition.prior to .. <br />~~....,..,.... <br />.---- <br />~..~...:." <br />".. <br />"., <br />.:', <br />.":. <br />.." <br />F:\PERMITS COUNIER\g:enera1 provisions\Wint~Weather Provisi0';'l.doc:x:.
The URL can be used to link to this page
Your browser does not support the video tag.