Laserfiche WebLink
A.•B.i <br />C. <br />D. <br />E. <br />F. <br />G. <br />H. <br />GENERAL PROVISIONS <br />GOVERNING .INSTALLATION OF SUBSURFACt:STRUCTURES AND PII'ELINES WITHIN COUNTY ROAD RlGIJTS-OF-WAY <br />PUBLIC CONVENIENCt;AND SAFETY: <br />A.Before obstructing any private driveway entrance or County road traveled way with a trench,spoil bank,equipment or other bamer pennitted for any <br />prolonged period of time,the Permittee shall notify the known users or the respective thoroughfare(s)involved,and shall provide access for vehicular and <br />pedestrian traffic 10 and from the road. <br />1.Unless otherwise pennitted,all work shall be conducted in such a manner that no less than one lane of the existing County road traveled way will <br />be maintained open to public traffic during working hours in a smooth and safe riding condition(s).Two lanes shall be open after working hours. <br />2.In cases where road closure is pcnnittcd,the pennission to close the foad will be granted under the condition that the Pennittee notify the <br />following persons and/or agencies of the time,the period of closure,and the detour route at least twenty-four (24)hours prior to said road closure. <br />a.The County of San Joaquin Public Works Departmcnt d.The local fire district <br />b.The County of San Joaquin Shcriff's Office e.The local school district <br />c.The local postal service f.The local rcsidents involved <br />B.Should ha1.ardous conditions relative to the installation operations warrant flagmen,as many capable nagmen as may be necessary shall be provided by the <br />Permittee and stationed in advance of work to warn and direct traffic.' <br />C.Lights,signs and barricades shall be furnished,erected and maintained by the Permittee for the adequatc warning and convenience of the public,with <br />particular attention to be taken in this regard after dark. <br />D.Any excess dirt and/or debris which might be a hazard to either automobile or pedestrian traffic,uncontrollable by lights,SigilSand barricades,shall be <br />removed from the jobsite daily. <br />STRUCTURES: <br />A Walls of structures shall be such quality and strength that they will resist all pressures and will not crack or he defonned in such a way as to create a hll7.ard <br />or maintenance problem at any time.Therefore,the minimum'structural requirements for concrete pipe plaeed under county road rights-of-way shall <br />conform to the following American Association of State Highway and transportation Officials (AASHTO)designations. <br />I.For concrete pipe up to and including thirty-three inches (33")inside diameter,extra strength concrete conforming to AASHTO Designation M <br />170M. <br />2.For concrete pipe thirty~six inches (36")inside diameter and larger,reinforced concrete pipe conforming to AASHTO Designation M 170M Class <br />lll. <br />3.Plastic pipe confomling to AASHTO Designation M294. <br />B.All concrete pipe joints with County road rights-of-way shall be scaled against leakage and/or infiltration ~,\'ithrubber gasket in conformance with Section <br />65-1 :06 of the California Standard Specifications,or with other methods as may be pennitted under the Special Provisions. <br />C.Cast-in-place concrete pipe,vitrified clay pipe,spiral welded steel pipe,or corrugated aluminum alloy pipe shall not be installed within the County road <br />rights-of-way unless specifically so stated in the Special Provisions,and only under the conditions as provided. <br />D.All structures to be buried within the County rights-of-way shall be set at such elevations as to allow minimum coverage of thirty inches (30")to the <br />centerline of the roadways and twelve inches (12")at the bottoms of borrow ditches each side of the roadways.The depths of structures shall be established <br />below a flat plane extending across the rights-of-way,no part of which shall extend above the elevations stated above;manholes,lampholes,valves,etc.not <br />included.Future surface elevations shall be anticipated as nearly 8.'>possible and structure elevations shall be establishcd for future adjustments accordingly. <br />E.The County hereby reserves the right to specify in the Special Provisions the gage and surfacc treatment of any galvanized corrugated metal pipe that is to be <br />installed. <br />F.All longitudinal utility facilities are to be established (and dimensioned on sketches)from surveyed centerline of road right-of-way,not from right-of-way <br />(border)lines.• <br />REPAIRS OF TIlE COUNTY RIGHT-OF-WAY: <br />AJI excavations shall be backfilled and compacted immediately after work therein has been completed. <br />Trenched shall not be left open farther than 300 fect in advance of pipe laying operations,or 200 feet to the rear thcreof,unless otherwise perinitted by the <br />Engineer. <br />Unless otherwise penniued under the Special Provisions.backfill shall be placed and mechanically compacted in such a manner that the relative compaction <br />throughout the entire fill within the County road right-of-way shall conform to the percentages of compaction as shown all the Trench detail. <br />Backfill material shall be placed in horizontal unifonn layers not to exceed in thickness.before compaction,0.67 foot in the bedding region,one -foot where <br />90%compaction is required,and two.fcet where 80%compaction is required. <br />No portion of the excavation(s)shall be compacted by ponding or jetting unless a maintenance bond is provided. <br />Gravel backfill material shall be utilized only wherc specifically so stated on the face of the pennie It shall be compacted by means ofa high-frequency <br />internal vibrator,the compactor to be a size and type approved by thc Engineer.Points of compaction shall not be greater than 18"centers and to the full <br />depth ofthc lift. <br />All pavements,curbs,gutters.sidewalks,borrow ditches,pipes,head walls,road signs,trees,shrubbery,and/or other permanent road facilities impaired by <br />or as a result of construction operations at the construction site(s)occupied by matcrials and/or equipment,shall be restored immediately upon backfilling of <br />the excavation to the original grades and cross sections,and to a condition as good as,or bettcr than existing prior to construction. <br />All surfacing materials of roadways and driveway npproaches cut or damaged by or as a result of construction operations,shall be replaced within ONE <br />WEEK following the backfilling of cxcavation,weather permitting,with compacted layers of surfacing materials at least as thick as the existing,and no less <br />than two inches (2")of asphalt concrete over six inches (6")of aggregate base,both as specified below. <br />1.Asphalt Concrete:Combined mineral aggregate shall conform to the quality and gradation requirements for Type "B"one-half ineh(In.) <br />maximum aggregate,coarse or medium gradation as specified in Section 39 of the California Standard Specifications.The bituminous binder to <br />be mixed with mineral aggregate shall be paving asphalt having (Grade PG 64-10),unless otherwise directed by the Engineer.Placement of <br />asphalt concrete surfacing shall confonn to the applicablc provisions of Section 39 of the California Standard Specifications. <br />2.Aggregate Base:Combined minerai aggregates shall conform to the quality and the grading for three-quarter inch (3/4'")maximum size <br />aggregate Class 2 Aggregate Base specified in Section 26 of the California Standard Specifications. <br />1.Before acceptBlice of repairs to the Count)'road rights-of-way,all unsightly and detrimental dirt,dust and/or debris shall be removed and the construction <br />areas left in a neal and presentable condition(s). <br />1.Ifnecessary,County road traveled way and driveway pavements shall be washed with water to remove dirt and dust. <br />2.Driveway approaches and field entrance pavements damaged by cquipment or spoil banks shall bc repaired as directed by the Engineer. <br />J..Upon request by the County,any selilement,sagging of surface,or cracking ofpa\'ement shall be repaired immediately by and at the sole expense of the <br />Permittee for a period of onc year following acceptance of the work. <br />X;I,ENCROACHME>.rrS\Gelleral ProvisioTlS (Eneroachmenl Pennits}\Winter Weather Provisions dOC>(