My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1602001 thru PS-1602500_ - PS-1602264
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1602001 thru PS-1602500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1602001 thru PS-1602500_ - PS-1602264
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:57:38 AM
Creation date
8/17/2016 1:18:05 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1602264
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1602001 thru PS-1602500
Year2
2016
Address
E/S CORRAL COLLOW 15'N/O PEONY
Application
SEFNCO/COMCAST
Supplemental fields
APN
PS-1602264
Cross Ref
PWP7110005
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
SPECIAL PROVISIONS.".'....:... <br />Winter Weath-er Utility Work <br />.'" <br />'.. <br />1.SUPERVISIoN:The utility compal?'Y(perDiittee)shall furnisn fu1l~timesupervisiori.of all work to insure <br />.compliance with the permit provision..'., <br />2.START OF WORK:No work within the County right-of-way shall be st~ed until the utility company <br />representative has made an evaluation of weather conditions and has determined the work can be . <br />"accomplished under the provisions of the'permit.. <br />.',', <br />3.CLEAN FAVEMENT:Dirt and mud sl;J.allno:tbe d~posii~d'on the pavement outside the area of work, <br />and if inadvertently tracked onto'the road trfiv:e1'Yay"~hall be removed iJ:oniediately.. <br />4.DAILY RESTORATION:'Pri"iiatedriveWays'arid:toad intersections shall be restored daily. <br />5..WEATHER-TIGHT CONDmONS:.AlUrenches shall bdilled and ccimpaded,ditches and other . <br />drainage facilities regarded and opened,and .the 'entire work area restored t~'weather-tight condition.prior to <br />any rain.'..'"'...":..'... <br />.--- <br />":'.. <br />-- <br />",.. <br />"..".' <br />'.'..:.:..~ <br />....... <br />.":. <br />.." <br />F:\PERMITS COUNTER.\ge.ne:r:aI provisions\Winter Weaiher Provisio~dot:lC •
The URL can be used to link to this page
Your browser does not support the video tag.