Laserfiche WebLink
.. <br />GENERAL PROvISIONS <br />GOVERNING INSTALLATION Of SUBSURfACE STRUCTURES AND PIPELINES WITHIN COUNTY ROAD RIGHTS-Of-WAY <br />PUBLIC CONVENIENCE AND SAfETY: <br />A.Before obstructing any private driveway entrance or County road traveled way with a trench,spoil bank,,equipment or other barrier permitted for any <br />prolonged period of time,the Permittee shall notify the known users of the respective Ihoroughfare(s)involved,and shall provide access for vehicular and <br />pedestrian traffic to and from the road... <br />I.Unless otherwise permitted,all work shall be conducted in such a manner that no less than one lane orlhe existing County road traveled way will <br />be maintained open to public traffic during working hours in a smooth and safe riding condition(s).Two lanes shall be open after working hours. <br />2.In cases where road closure is permitted,the permission to close the road will be granted under the condition that the Permittee notify the <br />following persons and/or agencies of the time,the period of closure.and the detour route at I~st twenty-four (24)hours prior to said road closure. <br />a.The County of San Joaquin Public Works Department d.The local fire district <br />b.The County of San Joaquin Sheriff's Office e.The local school district <br />c..The local postal seIViee f.The local residents involved <br />B.Should ~azardous conditions relative to the installation operations warrant flagmen,as many capable flagmen as may be necessary shall be provided by the <br />Pennittec and stationed in advance of work to warn and direct traffic. <br />C.'Lights,signs and barricades shall be furnished,ereeted and maintained by thc Permittee for the adequate warning and convenience of the public.with <br />particular attention to be taken in this regard after dark.- <br />D.Any excess dirt and/or debris which might be a hazard to either automobile or pedestrian tmmc,uncontrollable by lights,signs and barricadcs,.shall be <br />removed from thejobsite daily. <br />STRUCTURES:, <br />A.Walls of structures shall be such quality and strength that they will resist all pressures and will not crack or be deformed in such a way as to create a hazard <br />or maintenance problem at any time.Therefore,the minimum structuml requirements for concrete pipe placed under county road rights-of-way shall <br />confonn to the following American Association of State Highway and transportation Officials (AASHTO)designations. <br />I.For concrete pipe up to and including thirty:three inches .(33")inside diameter,extra strength concrete confonning to AASHTO Designation M <br />170M. <br />2.For concrete pipe thirty-six inches (36")inside diameter and larger,reinforced concrete pipe confonning to AASHTO Designation M 170M ClassilL. <br />3.Plastic pipe conforming to AASHTO Designation M294. <br />B.All concrete pipe joints with County road rights-of-way shall be sealed against leakage and/or infihration with rubber gasket in confonnance with'Secti<)n <br />65-1 :06 of the California Standard Specifications,or With other methods as may be permitted under the Special Provisions. <br />C.Cast-in-place concrete pipe,vitrified clay pipe,spiral welded steel pipe,or corrugated aluminum alloy pip'e shall not 'be installed within the County road <br />rights-of-way unless specifically so stated in the Special Provisions,.and only under the conditions as provided.' <br />D.All structures to be buried within the County rights-of-way shall be set at such elevations as to allow minimum coverage of thirty inches (30")to the <br />centerline of the roadways and twelvc inches (12")at the bottoms of borrow ditches each side of the roadways ..The depths ofstructure5 shall be established <br />below a flat plane extcnding across the rights-of-way.no part ofwhic~shall extcnd above the elevations stated above;manholes,lampholes,valves,etc.not <br />included.Future surface elevations shall be anticipated a,snearly as possible aM structure elevations shall be established for future adjustments accordingly. <br />E.The County hereby reserves the right to specify in the Special Provisions the gage and surface treatment'of any galvanized corrugated metal pipe that 'is to be <br />installed. <br />F.All longitudinal utility facilities arc to be established (and dimensioned on sketches)from surveyed centerline of road right-of-way,not from right-of-way <br />(border)lines. <br />REPAIRS Of THE COUNTY RIGHT-Of-WAY: <br />A.All excavations shall be backfilled and compacted immediately after work therein has been completed. <br />B.Trenched shall not be left open farther than 300 feet in advance of pipe laying operations,or 200 feet to the rear thereof.unless otherwise permitted by the <br />Engineer.. <br />C.Unless otherwise pcnnitted under thc Special Provisions,backfill shall be placed and mechanically.compacted in such a manner that the relative compaction <br />tliroughout the entire fill within the County road right-of~way shall conform to the percentages of compaction as shown on the Trench detail. <br />D.Backfill material shall be placed in horizontal uniform layers not 10 exceed in thickness,before compaction,0.67 foot in the bedding region,one -foot where <br />90%compaction is required,and two-feet where 80%compaction is required. <br />E.No portion of the excavati.on(s)shall be compacted by ponding or jetting unless a maintenance bond is provided. <br />F.Gravel backfill material shall be utilized only where specifically so stated on the face of the permit.It shall be compacted by means of a high-frequency <br />internal vibrator,the compactor to be a size and type approved by the Engineer.Points of compaction shall not be greater than 18"centers and to the full <br />depth of the lift. <br />G.All pavements.curbs,gutters,sidewalks.borrow ditches,pipes,head walls,road signs,trees,shrubbery.and/or other permanent road facilities impaired by <br />or as a result of construction operations at the construction site(s)occupied by materials and/or equipment.shall Dc restored immediately upon backfilling of <br />the excavation to the original grades and cross sections,and to a condition as good as,or better than existing prior to construction. <br />H.All surfacing materials of roadways and driveWay approaches cut or damaged by or as a result of construction operations.shall be replaced within ONE <br />WEEK following the backfilling of excavation,weather permitting,with compacted layers of surfacing materials at least as thick as the existing.and no less <br />than two inches (2")of asphalt concrete over six inches (6")of aggregate base,both as specified below. <br />I.'Asphalt Concrete:Combined mineral aggregate shall conform to the quality and gradation requirements for Type "B"one-half inch(ll2) <br />maximum aggregate.coarse or medium gradation as specified in Section 39 of the California St81idard Specifications.The bituminous binder to <br />be mixed with mineral aggregate shall be paving asphalt having (Grade PG 64-10),unless otherwise directed by the Engineer.Placement of <br />asphalt concrete surfacing shall confonn to the applicable provisions of Section 39 of the California Standard Specifications. <br />2.Aggregate Base:Combined mineral aggregates shall conform to the quality and the grading for three-quarter inch (3/4")maximum size <br />aggregate Class 2 Aggregate Base specified in Section 26 of the California Standard Specifications. <br />I.Before acceptance of repairs to the County road rights-of-way,all unsightly and detrimental dirt.dust and/or debris shall be removed and the construction <br />areas left in a neat and presentable condition(s). <br />I.If necessary,County road traveled way and driveway pavements shall be washed with water to remove dirt and dust. <br />2.Driveway approaches and field entrance pavements damaged by equipment or spoil banks shall be repaired as directed by the Engineer. <br />J.Upon request by the County,any settlement,sagging of surface,or cracking of pavement shall be repaired immediatcly by and at the sole expcnsc of the <br />~ermittec for a period of one year following acceptance of the work.' <br />X;\ENCROACHMENTS\GeneraI Pl'(wisions (Encroachment PermilS)\Winter Weather 'Provirioll$.doex