Laserfiche WebLink
'. <br />SPECIAL PROVISIONS <br />Winter Weather Utility Work <br />1.SUPERVISION:The utility company (permittee)shall furnish full-time supervision of all work to insure <br />compliance with the permit provision. <br />2.START OF WORK:No work within the County right-of-way shall be started until the utility comP1illY <br />representative has made an evaluation of weather conditions and has determined the work can be <br />accomplished under the provisions of the permit, <br />3.CLEAN PAVEMENT:Dirt and mud shall not be deposited on the pavement outside the area of work, <br />and if inadvertently tracked onto the road travel way shall be removed immediately, <br />4.DAILY RESTORATION:Private driveways and road intersections shall be restored daily. <br />5.WEATHER-TIGHT CONDITIONS:.All trenches shall be filled and compacted,ditches and other <br />drainage facilities regarded and opened,and the entire work area restored to weather-tight condition prior to <br />any ram. <br />X,IENCROACHMENTS\Generel Provisions (Encroachment Pennits)\Winter Weather Provisions.docx