My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1602501 thru PS-1603000_ - PS-1602734
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1602501 thru PS-1603000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1602501 thru PS-1603000_ - PS-1602734
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 9:01:21 AM
Creation date
9/16/2016 8:52:01 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1602734
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1602501 thru PS-1603000
Year2
2016
Address
S/S WOODBRIDGE RD 106'GOLF CT
Application
PACIFIC GAS & ELECTRIC - STOCKTON
Supplemental fields
APN
PS-1602734
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
SPECIAL PROVISIONS..'..... <br />Winter Weather Utility Work <br />1.SUPERVISION:The utility c6mpaJ;ly(penillttee)shall fumisn full~time supervision of all work to insure <br />.compliance wiili ilie permit provision..'., <br />2.START OF WORK:No work witb.intheCounty.nght-of-way shall be started until ilie utility company <br />representative has made an evaluation of weailierconditions and has determined ilie work can be . <br />"accomplished under ilie provisions of the'permit.. <br />3.CLEAN PAVEMENT:Dirt and mud s~no't be deposited'on ilie pavement outside the area of work, <br />and if inadvertently trackedonto'ilie road trfiY:elwaf ~hall be removed rn;miediateIy.. <br />4.DAILY RESTORATION:'Pri\TatedrivewaysaD.(l-toad intersections shall be restored daily., <br />5.WEATHER-TIGHT CONDmONS:.}illb;enches sharI be filled and compacted,ditches and oilier <br />drainage facilities regarded and opened,and'ilieentire work are;!restored t~'weather-tight condition'prior to'...'...anyraJ.Il. <br />.----- <br />:'.. <br />....... <br />.... <br />...:
The URL can be used to link to this page
Your browser does not support the video tag.