Laserfiche WebLink
—M <br />�0 <br />0 <br />0 <br />PCC Curb & Gutter <br />(Where exists) <br />L — <br />Const RECORD DFA ' i N10 <br />CorrecBlowt ®g� <br />No Chkm & <br />Limits of Clearing and Grubbing <br />Datey <br />Any Pelaw Uw5ing This DD ratiding ShgigflCl Vtflk <br />Var Limits of Polymer Asphaltic Emulsion (Seal Coat) and Screenings Var All Infowmm ion Dyj Iintpecdng Thc* SVe* Oft &0U4 <br />1'-2' Refer to Table on Sht No. 8 1'-2' <br />Center Divide/Curb (Where exists) E o 8 <br />L v <br />`o J MATCH Chip Seal Chip Seal MATCH C w �, AC Dike or PCC <br />o p EXISTING If— _--,F EXISTING c°� p o Curb (Where exists) <br />0 SLOPE _ � � _ SLOPE <br />-------------------- <br />--------------- I----- — ------------- <br />SHOULDER <br />------------ <br />SHOULDER DETAIL <br />WITH CURB & GUTTER <br />NOTES: <br />TYPICAL SECTION <br />1. Chip Seal must be placed in single layer on existing or prepared asphalt concrete pavement surface. No chip <br />seal is allowed on existing bridge deck and Portland Cement Concrete surfaces including pavement, railroad <br />crossing, etc. <br />CD Ln <br />2. <br />r« N <br />3. <br />s o o <br />�Ln <br />a `n <br />a <br />Z I <br />y <br />4. <br />� <br />0 <br />F <br />N <br />m <br />CD <br />D <br />5. <br />K <br />m <br />v <br />i <br />i <br />Z <br />6. <br />(n <br />Ln <br />7. <br />8. <br />601 <br />Screenings mast have fine gradation of 4" maximum . <br />One week prior to the start of work, the Contractor must furnish to the Engineer a schedule showing <br />proposed street closures on each half-day basis. No work will commence until this schedule is approved by <br />the Engineer. <br />The Contractor is to remove all Pavement Markers, prior to Chip Seal being applied to any area. Full <br />compensation must be considered as included in the contract unit price for Hot Mix Asphalt item of work <br />and no separate payment will be made therefor. <br />Temporary reflective raised pavement markers must be placed in accordance with the manufacturer's <br />instructions, unless instructed differently by the Engineer. Temporary reflective raised pavement markers <br />must be cemented to the surfacing with the adhesive recommended by the manufacturer, except epoxy <br />adhesive must not be used. In addition, these markers must be nailed to the pavement to assist in holding <br />them in place. Washers must be used to keep the nails from pulling through the markers. <br />All intersection radii within project limits must be sealed to existing edge of pavement, face of dike or lip of <br />curb and gutter. <br />Before Chip Seal is to be applied to any area, the Contractor must protect all utility covers, including but not <br />limited to maintenance holes, water valves and survey monument frames and covers. Contractor must <br />remove protective covers after Chip Seal. Full compensation must be considered as included in the contract <br />unit price for various items of work and no separate payment will be made therefor. <br />Surface preparation work must be as directed by the Engineer. Locations and dimensions of Pavement Repair <br />will be determined by the Engineer and must be placed 18 hours prior to placing Chip Seal. <br />The Contractor is to remove and dispose all existing Thermoplastic Traffic Stripes and Pavement Markings in <br />all areas. Full compensation must be considered as included in the contract price for Remove Thermoplastic <br />Traffic Stripes and Pavement Markings item of work and no additional compensation will be made therefor. <br />COUNTY OF SAN JOAQUIN NO SCALE <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />QTInccnt c42i CIVP-2018 -3/1Z 3/11g <br />Existing Roadway <br />SHOULDER DETAIL <br />WITHOUT CURB & GUTTER <br />10. The Contractor must perform street sweeping throughout the duration of the Chip Seal operations of the <br />project per the specifications. Full compensation for these sweeping operations must be considered as <br />included in the contract unit price paid for various items of work and no separate payment will be made <br />therefor. <br />11. The Contractor must perform Chip Seal operations only on weekends on streets in close proximity to schools, <br />or unless allowed by written approval from the Engineer. The Contractor must not begin Chip Sealing a street <br />after 1:00 PM without the approval from the Engineer. <br />12. Place Monument Frame and Cover at various locations, see Summary of Quantities for locations and <br />quantities. <br />13. ,Areas .in County right-of-way used by Contractor for staging and/or storage of materials will be approved by <br />'the Engineer. The areas utilized by the Contractor for staging and/or storage area must be restored to their <br />original condition. Any damages or unclean conditions to staging or storage areas must be repaired at the <br />Contractor's own expense. It will be the Contractor's responsibility to obtain permission from the property <br />owner to stage equipment or store materials on private property. The Contractor must provide a letter of <br />release from the property owner of the areas utilized for staging and/or storage of materials. <br />14. The Contractor must enter into an Agreement with the Central California Traction Company and Union Pacific <br />Railroad for any work within the Railroads' right-of-way. See SECTION 5-1.20C Railroad Relations of the <br />Specifications for further details. <br />15. The Contractor must post "No Parking - Tow Away" signs at 100 foot intervals on the street(s) to be worked <br />upon, at least 48 hours prior to placing the Chip Seal. These signs must state the day of the week and hours <br />of no parking. <br />16. "Loose Gravel" signs and "Speed Limit 25 mph" signs will also be required, alternately, at the beginning of the <br />work and at each intersection on both sides of the road. At no time will there be more than 1,500 feet <br />between such warning signs. "Loose Gravel" signs must be placed on each side street a minimum of 50 feet <br />prior to the intersection where such gravel has been placed. <br />17. Traffic delays due to construction operations must not exceed 10 minutes, or z mile of vehicle queue, <br />whichever occurs first. <br />TYPICAL SECTION AND <br />GENERAL NOTES <br />CHECKED DATE <br />77 <br />CHIP SEAL 2017-2018I Sheet No. <br />arious Roads in Supervisorial Districts 1, 2, 3, 4 and 5) 2 of 11 <br />