GENERAL NOTES <br />1. The Contractor must obtain all permits required for the construction and completion of <br />the project, and must perform all work in accordance with the requirements and <br />conditions of all permits and approvals applicable to the project. <br />2. The Contractor must submit a temporary traffic control plan and sidewalk closure plan to <br />the Engineer for approval two weeks prior to construction. <br />3. Prior to commencing any work, it will be the Contractor's responsibility to have each <br />utility company locate in the field their main services lines and laterals. The Contractor <br />must notify members of the Underground Service Alert (U.S.A) 48 hours in advance of <br />performing excavation work by calling the toll free number (1-800-642-2444). <br />4. The Contractor must field verify all existing highway and utility facilities' locations and <br />depths. It will be the Contractor's sole responsibility to locate and protect all existing <br />highway and utility facilities, so that no damage results to them during the performance <br />of this contract. <br />5. Match new joint and score mark spacing to existing Crack Control Joints whenever <br />possible. <br />6. Existing highway and utility facilities must remain in place unless otherwise noted. <br />7. Existing trees, shrubs, fences, mailboxes and other frontage improvements must remain in <br />place unless otherwise noted. <br />8. Existing drainage facilities must remain in place unless otherwise noted. The Contractor <br />must conduct earthwork operations so as not to modify or obstruct the existing drainage. <br />9. All Minor Concrete (Curb, Gutter & Sidewalk) work that is to be removed will be saw cut <br />or removed to the limits shown on the plans. The cost of saw cutting will be considered <br />as paid for under the various items of work involved. <br />10. All new Curb, Gutter and Sidewalk must conform to the existing flowline elevations with a <br />straight grade between conforms unless otherwise noted. <br />11. Install Expansion Joints at beginning and end of new Curb, Gutter and Sidewalk and <br />between new sidewalks and existing driveways. <br />12. Existing sprinkler systems, or portions thereof, will be maintained or protected during <br />construction operations. Any damage to the existing system must be repaired within 48 <br />hours at the Contractor's expense. Upon completion of the work, the Contractor must <br />restore the sprinkler system to its original condition. <br />13. The Contractor must perform all related work on streets where schools are situated, on <br />weekends or when school is not in session, unless allowed by written approval from the <br />V0o Engineer. <br />D <br />m <br />14. Placement of temporary "No Parking" signs must be installed at a minimum of 24 hours <br />00�:u <br />prior to work. Contractor is responsible for contacting adjacent property owner(s) to <br />71 arrange for access as necessary. <br />z <br />0 <br />COUNTY OF <br />DRAWN BY <br />Sergio Castan,eda <br />SAN JOAQUIN <br />DATE 0 <br />09/18 <br />NO SCALE GENERAL NOTES AND <br />DIRECTIONAL GUIDE <br />ECT ENGINE R DATE CHECKED <br />Northwest (NW) I I <br />Quadrant <br />� G <br />U QX1 Q <br />Face of <br />Curb <br />�\ n <br />Southwest (SW) I I BCR <br />Quadrant <br />I Northeast (NE) <br />Quadrant �oa9 <br />C <br />M <br />(+) (-) <br />Face of <br />Curb <br />U /\ <br />BCR I ISoutheast (SE) <br />(—)I I I Quadrant <br />NOTE: <br />Above is a directional guide to Sheet 4 through 6. <br />BCR is at the southernmost side of the <br />intersection. <br />SIDEWALK ACCESSIBILITY IMPROVEMENTS 2017-2018 Sheet No. <br />Various Locations in South Stockton and Woodbridge 2 of 8 <br />DATE <br />