Laserfiche WebLink
Mp. <br />n <br />N <br />N <br />N <br />cn <br />00.25' AC Planing (Mill—in—Place) <br />0.25' HMA Overlay <br />I I <br />JIU. Ort I ZI <br />Place Monument <br />Frame and Cover <br />00.25' AC Planing (Mill—in—Place) <br />0.25' HMA Overlay <br />x100' <br />0.25' HMA Overlay <br />COUNTY OF <br />DRAWN BY DATE <br />SAN JOAQUIN <br />PROJECT ENGINEER DATE <br />NO SCALE PLAN <br />CHECKED DATE <br />Hung Ho <br />6/18 <br />��! <br />��i%(U� <br />��ii�/�' <br />ffa�w��7•� <br />G/2//ifs <br />U <br />END PROJECT <br />Q <br />J <br />O <br />6 <br />M <br />N <br />(D <br />V) <br />� <br />I <br />I <br />�I <br />101 <br />� I <br />ISI <br />O <br />�1 <br />r <br />c <br />O10 <br />\ <br />J \ <br />U <br />L— — <br />-------------- <br />115 <br />� <br />\ <br />I <br />I <br />II <br />I <br />I � <br />I <br />I I <br />I I <br />I <br />SOWLES ROAD RESURFACING <br />(Peltier Road to Collier Road) <br />Sheet No. <br />4 of 6 <br />