Laserfiche WebLink
0 <br />0 <br />s <br />0 <br />0 <br />f <br />N <br />1 ELECTRICAL TRENCH DETAIL <br />7 $ SCALE: NTS <br />✓� REFUSE <br />NET <br />REFUSE <br />2' SOIL <br />HDPE-' <br />GEOMEMBRANE <br />GCL <br />VLVVI\IU" 1 <br />REFUSE API <br />✓� REFUSE �. <br />3 OVERLINER DETAIL <br />5 8 SCALE: NTS <br />6" <br />SOIL BACKFILL <br />12" LIFTS <br />HDPE PIPE---- <br />i <br />IPE <br />CLASS II A.B (TYP) <br />EXISTING GRADE <br />2'316 SS BALL VALVE (TYP2) <br />(SEE NOTE 1) 1 1/4" CAMLOCK DISCONNECT <br />QUICK CAP FROM REQ <br />ENVIRONMENTAL PRODUCTS OR <br />APPROVED EQUIVALENT <br />HDPE OVERSPILL <br />CONTAINMENT VAULT <br />i <br />2- <br />f <br />3" (—~ <br />SAND <br />BEDDING <br />NOTE <br />1. DEPTH WITHIN REFUSE FOOTPRINT SHALL BE <br />1.5 FT. <br />2. HDPE PIPE IN TRENCH SHALL BE SDR 11 <br />2 PIPE TRENCH DETAIL <br />4, 8 SCALE: NTS <br />Atat <br />PIPE STRAP 4"PIPE: UNISTRUT P2558-35 OR EQUAL <br />" GALVANIZED ALL TREAD ANCHOR <br />WITH NUTS AND WASHERS " <br />CONCRETE BUMPER BLOCK <br />4 FT LONG 9" W X 5" H DRILL AND EPDXY <br />HDPE VAULT BOX <br />BOTTOM (WELDED <br />REVISION I DATE <br />1 SS CHECK VALVE <br />3636 X 18 HDPE <br />VAULT BOX <br />G <br />N 1 J" DISCHARGE PIPING TO 2" HDPE <br />CONNECTION <br />" HDPE CONDENSATE <br />ISCHARGE TO TANK <br />FLEX ELECTRICAL CONDUIT <br />I I PVC ELECTRICAL CONDUIT (BELOW GRADE <br />�1" HDPE BALANCE <br />LINE <br />12" FLANGE ADAPTER WITH <br />SS BACKING: RING & BOLT PACK <br />5 SUMP CONNECTION DETAIL <br />7$ SCALE: NTS <br />RECO ArMING <br />Corrections B <br />No Chan esLBy <br />Date � ie'PhV <br />Any Person Using This Drawing Should Verity <br />l� All Information By Inspecting The Site Of Word <br />NOTE: <br />1. PIPE STRAP SHALL BE UNISTRUT OR EQUIVALENT. ALL PIPE STRAP SHALL BE 304 SS. <br />2. PIPE STRAP SHALL BE BENT TO FIT PIPE. <br />4 PIPE ANCHOR <br />5 $ SCALE: NTS <br />COUNTY OF SAN JOAQUIN NO SCALE DETAILS FOOTHILL SANITARY LANDFILL <br />GAS SYSTEM UPGRADE PHASE 1 <br />DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE <br />J. Acevedo 11/20/15 J. Acevedo 11/23/15 J. Chandra 11/23/15 <br />Sheet No. <br />8 of 9 <br />