Laserfiche WebLink
F <br />distance between cross—cuts are less then 150' the entire area between <br />uts shall be planed and resurfaced with one (1) inch of ,Asphalt Concrete. <br />urfacing requirements shall be in addition to County Standard Drawing No. <br />cing for Bell Hales shall meet these requirements. If excavation occurs within <br />the shoulder or lane, only that area shall be resufaced as shown. <br />4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br />Coat for that half of the roadway containing the trench can be used in lieu of <br />resurfacing. Section 2-5.03 (13-2). <br />Paved Shoulder <br />(4 <br />\i/ <br />COUNTY OF SAN JOAQUIIoN <br />DEPARTMENT OF PUBLIC WORKS <br />Date: MAY 2015 <br />Dwg. No. R-36 <br />