My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2018_PS-1800000 thru PS-1800500_ - PS-1800241
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2018
>
PS-1800000 thru PS-1800500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2018_PS-1800000 thru PS-1800500_ - PS-1800241
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 9:21:42 AM
Creation date
3/20/2019 10:25:14 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1800241
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2018\PS-1800000 thru PS-1800500
Year2
2018
Address
GOLDEN GATE/SUTRO
Application
AT&T - FRESNO
Supplemental fields
APN
PS-1800241
Cross Ref
PWP730079
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
WORK L❑CATI❑N: MULTIPLE L❑CATI❑NS <br />(SEE MAP), ST❑CKT❑N, CA <br />,A ' P.5A WORK AREA ` <br />AUG <br />tJ <br />DW&3 <br />�a <br />a <br />DDWORK AREA <br />WG.2 <br />"-Av 3 <br />v, P.10 WORK AREA UPS, 1 <br />DWG.4 <br />y <br />CD <br />L <br />Gianone Park <br />P (NEW) WORK AREA <br />N1 <br />CALL T C TOLL FREE <br />48 HOURS PRIOR TO DIGGING <br />FOR ALL SUB—STRUCTURE <br />LOCATIONS <br />800-227-2600 <br />SCOPE OF WORK: <br />PLACE A GROUND BED CONSISTING OF (3)-8' GROUND RODS AND #6 GROUND <br />WIRE AT POLES 1, 5A, 10, AND 18, PLACE NEW DOWNGUY WITH J° ANCHOR AT <br />POLES 5A AND 18, SET A NEW POLE ACROSS THE STREET FROM P,18, <br />P.1 WORK AREA FACING EAST. <br />r. DWG.5 <br />y <br />PAS WORK AREA <br />DWG.S - <br />C3) D RnnS Nw, <br />AT&T ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OF THE <br />SUBSTRUCTURE INFORMATION HEREIN PROVIDED. THE USER ASSUMES <br />RESPONSIBILITY FOR VERIFYING SUBSTRUCTURE LOCATIONS BEFORE <br />EXCAVATING AND ASSUMES ALL LIABILITY FOR DAMAGE TO TELEPHONE <br />FACILITIES AS A RESULT OF SUCH EXCAVATION.CALL UNDERGROUND <br />SERVICE ALERT ON: (800) 227-2600 TWO DAYS BEFORE DIGGING IN <br />PROXIMITY TO TELEPHONE PLANT. <br />at&t <br />P,5A WORK AREA FACING WEST, <br />P10 WORK AREA FACING WEST. <br />P (NEW) WORK AREA FACING EAST. <br />P,18 WORK AREA FACING WEST. <br />1 1 11/2017 <br />rpAFL Network Services <br />A Fujikura Business <br />THIS JOB WAS ENGINEERED AND DRAWN BY AFL NETWORK SERVICES <br />UNDER CONTRACT TO AT&T. FOR QUESTIONS AND ASSISTANCE ON THIS <br />JOB PLEASE CALL ENGINEER AS NOTED IN TITLE BOX. <br />CONST <br />
The URL can be used to link to this page
Your browser does not support the video tag.