My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
V39-V65 (Bridge)
PublicWorks
>
VAULT MAPS
>
Bridge Maps
>
Drawer V
>
V39-V65 (Bridge)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2024 10:01:50 AM
Creation date
9/1/2020 9:29:08 AM
Metadata
Fields
Template:
Bridge Maps
Project
Victory Road Bridge No. 29C-467 Replacement Project Over Lone Tree Creek
Year
2017
Project Engineer
B. Waldrop
Roads Worked
Victory Rd.
Red Lines
Yes
Federal #
BRLO-5929 (216)
Supplemental fields
Bridge #
29C-467
Cross Ref
V39 - V65 (Bridge)
DocCategory
Improvement Plans
Type
Replacement Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8" X 8" X%" BEARING <br />PLATE <br />PAVEMENT OR <br />GROUND LINE—y <br />5/8110 X 7Y211 <br />HEX HEAD BOLT <br />AND 5/a" NUT <br />IMPACT HEAD <br />---1 " <br />B <br />HEX NUT <br />WITH (1 ) WASHER <br />5/8116 <br />X 9Y211 <br />HEX <br />HEAD BOLT <br />AND <br />5/8" NUT <br />WITH <br />(2) WASHERS. <br />SOIL TUBE <br />T S 8 X 6 X 1/8 <br />6'-0" LENGTH <br />B <br />SECTION A- A <br />POST NO. 1 <br />WOOD POST <br />BCT CABLE <br />ANCHOR ASSY -\ <br />GROUND STRUT <br />5/a " Y X 91/211 <br />HEX HEAD BOLT <br />AND %" NUT <br />WITH (2) WASHERS <br />SOIL TUBE <br />T S 8 X 6 X 1/8 <br />6'-0" LENGTH- <br />PLAN <br />ENGTH- <br />1 " Hex WOOD POST <br />5y2" NUT WITH 5/a'"0 X 10" <br />(1) WASHER H.G.R. BOLT AND <br />PIPE SLEEVE 5/a" NUT WITH <br />(1) WASHER UNDER <br />NUT ONLY----------' 8" X 8" X 5/8" BEARING <br />PLATE <br />GROUND STRUT - <br />5/8"10 X 71/2" <br />HEX HEAD BOLT <br />WITH %" NUT SOIL TUBE <br />TS 8 X 6 X 1/8 <br />6'-0" LENGTH --- <br />SECTION B -B <br />PARTIAL VIEW POST NO. 1 <br />71/211 <br />I r� <br />PAVEMENT OR <br />GROUND LINE <br />5/$110 X 9%21' <br />HEX HEAD BOLT AND <br />5/a" NUT WITH <br />(2) WASHERS <br />SECTION C -C <br />AT POST NO. 2 <br />W -BEAM RAIL <br />i <br />TERMINAL SYSTEM (TYPE SKT) NOTES: <br />6 8 2 <br />X " x 1'- "" <br />WOOD BLOCK -- <br />_ <br />1 . FOR ADDITIONAL DETAILS OF TERMINAL SYSTEM (TYPE SKT), <br />OW <br />145.55 <br />B8 AND %" NUT <br />REFER TO THE MANUFACTURERS INSTALLATION INSTRUCTIONS. <br />o <br />0 <br />LO <br />LO <br />WITH (1) WASHER <br />6" X 81" X 6'-01" <br />UNDER NUT ONLY. <br />2. TERMINAL SYSTEM (TYPE SKT) MUST BE CONSTRUCTED SO <br />WOOD POST- <br />SEE NOTE 5 — <br />THAT THE FULL LENGTH OF THE TERMINAL SYSTEM GUARD <br />o� <br />O Qi <br />RAILING IS IN STRAIGHT ALIGNMENT. TERMINAL SYSTEM <br />PAVEMENT OR _' <br />RL�4sn� � V✓a<< <br />(TYPE SKT) CAN BE FLARED AT A MAXIMUM RATE OF 25:1 <br />GROUND LINE----,,`- <br />w <br />0 Z <br />0 <br />TO PREVENT THE IMPACT HEAD FROM ENCROACHING ON THE <br />o <br />SHOULDER. THE FLARE IS NOT REQUIRED AND MAY BE <br />11 <br />ELEV ION <br />DECREASED OR ELIMINATED FOR SPECIFIC INSTALLATIONS. <br />I <br />31/2110 <br />a v <br />HOLES---/ � <br />HO ao <br />LES - <br />II <br />�ji <br />N Q <br />3. TERMINAL SYSTEM (TYPE SKT) NOT TO BE USED WHERE <br />,I <br />EXTRUSION OF THE RAIL ON THE BACK SIDE OF THE <br />M <br />D <br />INSTALLATION WOULD BE IN THE PATH OF PEDESTRIAN TRAFFIC <br />PROJECT ENGINEER <br />OR WHERE THERE IS LESS THAN 25'-0" BETWEEN THE OUTLET <br />SIDE OF THE IMPACTED HEAD AND ANY ADJACENT VEHICLE <br />- <br />I <br />TRAFFIC. <br />SECTION D -D <br />0 <br />X O <br />POST NO. 3 THROUGH NO. 8 <br />SEE <br />OTE <br />ALIGNMENT OF RAILING AT EDGE <br />OF PAVED SHOULDER OR OFFSET <br />LINE OF EDGE OF TRAVELED WAY. ATTACH IMPACT HEAD <br />6" X 8" TO WOOD POST NO. 1 <br />WOOD POST (POST WITH LAG SCREWS. - <br />NO. 3 THRU NO. 8)-� CABLE ANCHOR BOX--\ <br />W -BEAM ELEMENT W -BEAM ELEMENT <br />END SECTION -- <br />PAY I TMTTS FOR TERMINAL SYSTEM (TYPE SKT) <br />See 6/-3" 6/-311 6'- 3" <br />)te 2 <br />a <br />i <br />RAIL SPLICE - <br />M <br />Q <br />OW <br />145.55 <br />U <br />/ <br />o <br />0 <br />LO <br />LO <br />4' <br />FILL AT BACK <br />¢CnQ_ <br />PE,Q,-CALTRANS <br />PLAN 133-6 <br />Z/ <br />Z Iu <br />I!E <br />SEE NOTE 5 — <br />Cm <br />� I J <br />O <br />I <br />O Qi <br />N TE: STATIONING PER <br />FILL AT FRONT <br />RL�4sn� � V✓a<< <br />YU <br />R" LINE <br />w <br />0 Z <br />0 <br />OF WALL <br />�RE <br />/ <br />z <br />WALL <br />ELEV ION <br />per t.C.0. 010 <br />z� <br />a v <br />II <br />�ji <br />N Q <br />Q <br />U <br />D <br />PROJECT ENGINEER <br />W N <br />N <br />B. WALDROP <br />I <br />DRAWN BY <br />0 <br />X O <br />J <br />N <br />J. JACKSON <br />C2 <br />_3(n <br />W U- <br />= W <br />U X <br />X <br />V58 <br />PLAN <br />0 <br />6,-31" <br />4. FOR THE LENGTH AND TYPE OF METAL BEAM <br />GUARD RAILING OR METAL BARRIER RAILING THE <br />TERMINAL SYSTEM IS ATTACHED TO, SEE PROJECT <br />PLANS. FOR TYPICAL USE OF THIS TERMINAL <br />SYSTEM WITH GUARD RAILING, SEE THE RSP <br />A77P, RSP A77Q AND RSP A77R SERIES OF THE <br />REVISED STANDARD PLANS. <br />5. ATTACH RAIL ELEMENT TO THIS POST AND BLOCK. <br />PAYMENT FOR THIS POST, BLOCK AND HARDWARE <br />IS INCLUDED IN PAYMENT FOR THE TYPE OF <br />RAILING OR BARRIER THE TERMINAL SYSTEM IS <br />ATTACHED TO, NOT PART OF PAYMENT FOR <br />TERMINAL SYSTEM (TYPE SKT). <br />GUARDRAIL EXIT <br />START AWAY FROM TRAFFIC <br />FOR TYPICAL GRADING REQUIREMENTS, <br />SEE TYPE 11A LAYOUT ON REVISED STANDARD <br />PLAN RSP A77P1. <br />\--IMPACT HEAD <br />o � 1 <br />61-311 6/-311 6/-311 <br />-WOOD POST NO.'S <br />RAIL I � C I <br />WOOD POST N0. 29 A <br />SPLICE D SEE SECTION C -C. <br />PAVEMENT OR GROUND LINE - <br />_CABLE GROUND <br />\ WOOD POST ANCHOR STRUT <br />NO. 4 BOX <br />WOOD POST NOS. 59 6 7 D <br />AND 8, SEE SECTION D- D. SOIL TUBE <br />WOOD POST N0. 31 C <br />ELEVATION <br />SEE SECTION D -D. <br />A <br />TERMINAL SYSTEM (TYPE SKT) <br />NO SCALE <br />WOOD POST NO. 19 <br />SEE SECTIONS A -A AND B -B. <br />ANCHOR CABLE <br />DATE CHECKED BY DATE VICTORY ROAD BRIDGE No. 29C-467 <br />J. WALKER - REPLACEMENT PROJECT <br />DATE SHEET NAME SCALE OVER LONE TREE CREEK <br />8/28/18 CONSTRUCTION DETAILS AS NOTED FEDERAL PROJECT NO. BRLO-5929(216) <br />QRpFESS�C� <br />q <br />1 i M <br />w No. <br />C-59724 m <br />V� V 1 \- <br />9TF CF I CAL�Fp�� <br />'ON 133HS <br />83MVHG <br />IROW <br />-- TCE <br />I I <br />U- �9�- <br />I <br />--mo <br />y� <br />TRVCT 22 L <br />-F—R. <br />TA <br />— <br />INT <br />TYPE -4; (CASE 2) <br />u 68#92 56-.Wnom <br />�eW 4-7.00— <br />B 8 W 445.60� <br />W 14V.1019W 1145 Q <br />TEMP FENCING <br />(TYPE CHAINLINK) <br />FG 149.57 I FG 148.52 FG 146.93 <br />6+74 C/L DWY 3 <br />(N) EP x <br />I <br />I �Cty l�ne <br />D e te�-ed <br />WALL PLAN VIEW <br />N.T,S. <br />00 <br />II <br />- 22'Co <br />°O i <br />TOW �D 6 '�- 6' 10' <br />149,00 <br />TOW T <br />B 148.00 TOW 147.00 <br />147.70 147.00 <br />Tq± OF FOOTING <br />144.50 <br />WALL PENETRATION <br />6+85.38, 36.83' RT. <br />12" FL 14 5.5 4 <br />RETAINING WALL <br />OW <br />145.55 <br />BOW BOW <br />145.60 145.68 <br />UTILITY OPENING <br />4' <br />FILL AT BACK <br />PE,Q,-CALTRANS <br />PLAN 133-6 <br />U <br />OF WALL <br />I <br />D. <br />N TE: STATIONING PER <br />FILL AT FRONT <br />RL�4sn� � V✓a<< <br />R" LINE <br />OF WALL <br />'De I e+ed <br />WALL <br />ELEV ION <br />per t.C.0. 010 <br />N.T. . <br />-- FG / <br />LOL <br />4 <br />�1 <br />TOW <br />RETAINING WALL TY?(5, <br />(CASE 2) PER C4TRANS <br />STD RSP 13 -g <br />SLOPt AWAY FROM <br />BOW RETAINING WALL <br />EG <br />No C' hanges V <br />BOTTOM <br />All Inftwmation ft lnspec*V The Site Of Work <br />ITT <br />oPau!H COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC <br />WORKS BRIDGE DIVISION <br />I a <br />1810 E. HAZELTON AVENUE <br />STOCKTON, CA 95205 <br />q�lFOa�.1 PHONE: (209) 468-3000 <br />PROJECT MANAGE CONSULTANT) FAX: (209) 468-2999 <br />CONCRETE BACKFI . PLACE <br />AGAINST FIRM COMPETENT <br />EXISTING SOILS, <br />TYPICAL CTION <br />T.S. <br />TYPE 5 WALL <br />SHEET NO. <br />N v 5 $ OF 27 <br />BEYOND ENGINEERING <br />2525 NATOMAS PARK DRIVE, SCUTE 900 SACRAMENTO, CA 95833 DT -3 <br />916.841.9100 TEL 916.641.9222 FAX WWW.NV5.COM <br />w <br />LO <br />M <br />I <br />v <br />rn <br />CV <br />6 <br />z <br />w <br />c� <br />0 <br />Cr <br />m <br />a <br />a <br />0 <br />Cr <br />(L' <br />0 <br />U_ <br />a <br />z <br />U <br />w <br />0 <br />Cr <br />
The URL can be used to link to this page
Your browser does not support the video tag.