Laserfiche WebLink
California MUTCD 2014 Edition , <br />(FHWA's MUTCD 2009 Edition, including Revisions 1 & 2, as amended foruse In California) <br />Tabla 61F-W1{CA). Maxirnnrn Spacil,!'.J o-/ Channelizing Devices •. <br />IVlmlimum Channelizing Devices Spacing l ~=-I <br />· (mph) Taper' Tangent Conflic'i"' <br />(feet) (feet) (feet) <br />. 1 20 <br />-.. <br />20 40 10 <br />25 ' 25 50 12 <br />30 30 60 15 <br />"" <br />35 <br />. <br />35 70 17 <br />40 40 80 20 <br />45 45 90 22 <br />50 50 100 25 <br />55 50 100 25 <br />60 5[) 100 25 <br />65 ·50 100 25 <br />70 50 100 · 25 <br />75 50 100 25 <br />,r,;-- <br />• Maximum channelizing device spacing for all speeds on one-lane/two-way tapers is <br />20 feet. · <br />Maximum channelizing device spacing for all speeds on downstream tapers is 20 <br />feet. · <br />All other tapers are as shown. <br />" Use on intermediate and short-term projects for taper and tangent sections where <br />there are no pavement markings or where there is a confiict between existing · <br />pavement markings and channelizing devices, <br />Chapter 6F -Temporary Traffic Control Zone Devices <br />Part 6 -Temporary Traffic Control <br />Page 1117 <br />November 7, 2014 <br />f I <br />rl