My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2019_PS-1901001 thru PS-1901500_ - PS-1901145
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2019
>
PS-1901001 thru PS-1901500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2019_PS-1901001 thru PS-1901500_ - PS-1901145
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 9:36:42 AM
Creation date
2/18/2021 9:32:39 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1901145
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2019\PS-1901001 thru PS-1901500
Year2
2019
Address
GRANT LINE ROAD & MOUNTIAN HOUSE
Application
TEICHERT CONSTRUCTION
Supplemental fields
APN
PS-1901145
Cross Ref
PWP790110
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-2- <br />Special Conditions for <br />Encroachment Permit <br /> <br /> <br />11. Grant Line Road subject to pavement cuts shall receive a 1” asphalt concrete overlay as per San <br />Joaquin County Department of Public Works Improvement Standards Section 2-5.0 Trench Cut <br />Policy. Shoulder areas shall be brought up to the finish grade as directed by the County. <br /> <br />12. No paving joints are allowed within paved shoulder; contractor shall pave all the way to outer <br />edge of paved shoulder. <br /> <br />13. Class II Aggregate Base shoulder backing is required from the edge of pavement, a minimum of <br />4-inches thick by 4-feet wide. <br /> <br />14. Contractor shall establish existing roadway and drainage grades within the construction area. <br />Any repair to roadways and adjacent areas shall match existing grades. Any proposed grade <br />changes shall receive prior approval from County. <br /> <br />15. Above ground vaults, panels and/or other similar facilities will be allowed within the right-of-way if <br />located as far to the outside edge as possible. Utility vaults shall be located a minimum of 4’-0” <br />from edge of pavement. <br /> <br />16. County roads shall be kept clean from mud and debris at all times along the access points and <br />work zone areas during entire project. All standard roadway striping and signage shall be clearly <br />visible, maintained and restored throughout the construction zone during and after the project. <br /> <br />17. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br />free of dirt, mud and debris during construction activities. The contractor shall provide daily, and <br />as determined to be necessary by County inspectors, street sweeping using a modern <br />mechanical or vacuum-assisted street sweeper. <br /> <br />18. The contractor shall not conduct construction operations in rain or heavy fog conditions.
The URL can be used to link to this page
Your browser does not support the video tag.