Laserfiche WebLink
o <br /> Texaco Refining and Marketing Inc. <br /> March 3011 1989 <br /> 202/150-4150 <br /> a <br /> sary) . MSDSs must be attached to the inside back cover <br /> r <br /> :i of this site safety plan,. on an as-used basis (see <br /> Appendix D) . <br /> DRILLINGS <br /> { II <br /> During the drilling operation,. two persons (one designated <br /> as "driller" , and the other as "helper") must be present at all <br /> times. The area of operation will be protected by an exclusion <br /> i <br /> zone, with one access. No unauthorized personnel are to enter <br /> the exclusion zone. The Site Safety Officer or the field team <br /> leader has the authority to shut down drilling operations <br /> wheneved a hazardous situation is deemed present. <br /> i <br /> .I <br /> �I <br /> ELECTRICAL EQUIPMENT <br /> Allielectrical equipment and power cables used in wells or <br /> structures containing petrochemical contamination must be <br /> explosion-proof or intrinsically safe, and equipped with a three- <br /> II <br /> wire ground lead as described in National Electric Code (NEC) <br /> Class I Division I, II groups A, B, . C, and D. <br /> i <br /> EMERGENCY RESPONSE <br /> In fhe event of an accident or, emergency situation, im- <br /> mediate action must be taken by the first person to recognize the <br /> iE <br /> event. First aid equipment is located on-site with the field <br /> personnel. Notify the Project Manager and Site Safety Officer <br /> about thesituationimmediately after emergency procedures are <br /> implement 1ed. <br /> 6 <br /> o <br /> r <br /> o � <br />