Laserfiche WebLink
qj j <br />d <br />k�an�a <br />P <br />tl <br />Y <br />1 20 10 0 20 <br />I tr „., 20' <br />i <br />THIS PIAN SET SHALL ONLY BE UITUZRD TO CONSTRUCT THE SEPTIC <br />SYTEM IMPROVEMENTS. <br />) CONTRACTOR SHALL -INSTALL SEWER CLEANOUT PER SAN JOAQUIN <br />COUNTY STANDARDS WITH APPROPRIATE FITTINGS AND REDUCER. <br />CONTRACTOR SHALL VERIFY THE LOCATIONS OF THE UTILITY <br />CONNECTIONS WITH THE PLUMBING PIANS PRIOR TO CONSTRUCTION OF <br />PROPOSED STUBS AND STUB 5 FEETFROM THE FACE OF THE <br />BUILDING. <br />CONTRACTOR SHALL_ INSTALL. SEWER MANHOLE PER SAN JOAQUIN <br />COUNTY STANDARDS AND SPECIFICATIONS. <br />CONTRACTOR SHALL EXCAVATE EXISTING SEVER LINE 10 VERIFY THE <br />HORIZONTAL AND VERTICAL ALIGNMENT PRIOR TO THE INSTALLATION OF <br />THE SEWER STRUCTURE/PIPE. CONTRACTOR SHALL INFORM THE <br />ENGINEER IF THE ALIGNMENTS ARE DIFFERENT THAN SHOWN. <br />CONTRACTOR SHALL- CONNECT TO STUB PER SAN JOAQUIN COUNTY <br />STANDARDS AND SPECIFICATIONS, <br />CONTRACTOR SHALL INSTALL SEWER CLEANOUT PER SAN JOAQUIN <br />COUNTY STANDARD DRAWINGS AND SPECIFICATIONS. SEE DETAIL. ON <br />SHEET C1.2 FOR ADDITIONAL INFORMATION. <br />CONTRACTOR SHALL INSTAI.-L 15,000 GALLON PRIMARY SEPTIC TANK <br />PER SAN JOAQUIN COUNTY STANDARD DRAWINGS AND SPECIFICATIONS. <br />SEE DE.TAIL.. ON SHEET C1.2 FOR ADDITIONAL INFORMATION. <br />CONTRACTOR SHALL INSTALL 15,000 GALLON PRE-ANNOXIC RETURN <br />TANK PER SAN JOAQUIN COUNTY STANDARD DRAWINGS AND <br />SPECIFICATIONS. SEE DETAIL ON SHEEN C1.2 FOR ADDITIONAL. <br />INFORMATION. <br />CONTRACTOR SHALL INSTALL 30,000 CALLON EQUALIZATION 'TANK PER <br />SAN JOAQUIN COUNTY STANDARD DRAWINGS AND SPECIFICATIONS. SEE <br />DETAIL. ON SHEET C1.2 FOR ADDITIONAL INFORMATION. CONTRACTOR <br />SHALL INSTALL PUMP PER ORENCO'S RECOMMENDATIONS, <br />CONTRACTOR SHALL INSTALL ADVANIEX AX --MAX 250-35 EFFLUENT <br />TREATMENT SYSTEM PER MANUFACTURER'S RECOMMENDATIONS. <br />CONTRACTOR SHAI...L INSTALL RECIRCULATION PUMP PER ORENCO'S <br />RECOMMENDATIONS. <br />CONTRACTOR SHALL INSTALL ADVANTEX AX --MAX 225-35 EFFLUENT <br />TREATMENT SYSTEM PER MANUFACTURER'S RECOMMENDATIONS. <br />CONTRACTOR SHALL. INSTALL RECIRCULATION PUMP PER ORENCO'S <br />RECOMMENDATIONS. CONTRACTOR SHALL INSTAL...L TWO (2) ORENCO <br />PUMPS PF501034, 50GPM, 3/4 HP, 3 PHASE FOR DISCHARGE TO <br />LEACH FIELD. <br />CK.) CONTRACTOR SHALL. INSTALL SEPTIC SYSTEM CONTROL PANEL_. <br />ICOM—DAX/S/DAX PTROCSx7 480V PER ORENCO'S SPECIFICATIONS <br />AND DETAILS. <br />CONTRACTOR SHALL INSTALL ORENCO 4 --WAY AUTO—DISTRIBUTING VALVE <br />PER MANUFACTURERS SPECIFICATIONS. <br />CONTRACTOR SHALL INSTALL PRESSURE DOSED SEWER LEACH FIELD IN <br />ACCORDANCE WITH SAN JOAQUIN COUNTY STANDARDS AND <br />SPECIFICATIONS. SEE DETAILS ON SFIEET C1.2 FOR CALCULATIONS AND <br />ADDITIONAL INFORMATION. THE CONTRACTOR SHALL EXCAVATE THE <br />EXISTING GROUND TO THE SOIL STRATUM LAYER UTILIZED IN THE <br />LEACH FIELD SEPTIC SYSTEM CALCULATIONS. PRIOR TO CONSTRUCTION <br />THE CONTRACTOR SHALL CONTACT THE GEOTECHNICAL ENGINEER TO BE <br />PRESENT ON—SITE TO VERIFY THE PERCOLATION RATE OF THE SOIL <br />STRATUM LAYER. CONTRACTOR SHALL COORDINATE WITH SAN JOAQUIN <br />COUNTY FOR ANY INSPECTION DURING CONSTRUCTION BY COUNTY <br />PERSONNEL. <br />PROPOSED 100`o LEACH FIELD EXPANSION AREA PER SAN JOAQUIN <br />COUNTY STANDARDS AND SPECIFICATIONS. <br />*USE EXTREME CAUTION* 10 AVOID UNDERGROUND UTILITIES WHEN <br />INSTALLING FOOTINGS FOR WALL..S AND FENCES AT ALL UTILITY <br />WALL./FENCE CROSSING, <br />CONTRACTOR SHALT_ *USE EXTREME CAUTION* WHEN INSTALLING SEWER <br />NEAR EXISTING UTILITIES, CONTRACTOR SHALL ENSURE THAT 'THERE IS <br />ADEQUATE SEPARATION BETWEEN THE PROPOSED SEWER AND EXISTING <br />UTILITIES. CONTRACTOR SHALL NOTIFY ENGINEER IN THE EVENT OF' ANY <br />CONFLICT. <br />100 FEET PRIVATE WELL. SETBACK RADIUS LINE, <br />COPYRIGHT _ 1_Z__ NORTHSTAR ENGINEERING GROUP, INC <br />MENT FOCUSED w PASSION DRIVEN <br />rrrrrr <br />f, <br />M <br />Max Ivan Medinra <br />C-2&882 <br />A <br />06.301'7 <br />_ ... <br />CONSULTANTtop <br />Enoeering Group, I <br />WC11/IL ENGINEERING ;'_,S'URVEYIN'G 0 PIANNING <br />620 12th Street Modesto, CA 9,5354 <br />(203) 524 -3525' Phone (209) 524-3.w26 Fax <br />IDENTIFICATION STAMP <br />DIV. OF THE STATE ARCHIIIECT <br />OFFICEF REGULA11ON <br />PL. 2-11551 <br />AC, .--_.... ..__ FLS _._.. _ SS,___ <br />DATE <br />NO DATE BY DESCRIPTION <br />REVISIONS <br />DRAWING <br />NUMBER: C2 ::1 <br />