Laserfiche WebLink
SEWER LEACH LINE TRENCH <br />NTS <br />1/4" HOLES �. <br />PIPE PERFORATION DEO <br />NTS <br />IA. P.V.C. PIPE <br />PAPER, FILTER <br />AW, OR <br />'OVED MATERIAL <br />CLEANOUT LID <br />ADJUST TO FINISH GRAD <br />2" GRAVEL <br />-��77797A7�z.i... fir. <br />1/4" HOLES AT 18" O.C. <br />(STAGGER WITH 90' HOLES) <br />1. CONTRACTOR SHALL INSTALL BERM AND <br />DIVERSION DITCH AROUND PROPOSED LEACH <br />FIELD TO PROTECT FROM DIRECT SURFACE <br />STORMWATER RUNOFF. <br />/-PROPOSED MOUND <br />EXISTING GRADE <br />>> c'!vi� <br />DRAINAGE DIVERSION DITCH <br />NTS <br />NTS <br />Sol <br />C <br />12" <br />CHRISTY VALVE <br />BOX TRAFFIC RATED <br />I I i 4" P.V.C. PIPE <br />CLAY <br />D DRAIN ROCK <br />4" MIN TO 8" MAXI\, <br />THREADED CLEAN-OUT PLUG--' <br />CLEAN-OUT RISER <br />SEE PLANS FOR PIPE <br />SIZE AND SLOPE <br />SEE PLANS FOR PIPE <br />SIZE AND SLOPE <br />NTS <br />CONCRETE (WHERE OCCURS) <br />CHRISTY V-1 PROTECTION BOX WITH CHRISTY <br />F08R CONCRETE LID, OR CHRISTY G05T <br />PROTECTION BOX WITH CHRISTY No. G05CT <br />LID, OR EQUIVALENT. <br />SEE PLANS FOR PIPE <br />SIZE AND SLOPE <br />NNECTION <br />1 -OUT RISER SHALL BE <br />THE SAME SIZE AS THE <br />LATERAL. <br />2. CLEAN-OUT RISER TO BE OF <br />SAME PIPE MATERIAL AS THE <br />MAIN. <br />3. SEE SAN JOAQUIN COUNTY <br />STANDARDS AND <br />SPECIFICATIONS FOR <br />ADDITIONAL INFORMATION <br />LONG RADIUS BEND <br />4000 GALLON <br />COMMERCIAL SEPTIC TANK <br />MODEL TY4000-EE-ST-6D4W <br />TRAFFIC RATED <br />IAPMO LISTED <br />16, -11" - <br />IF <br />II I I LI <br />II I I II <br />II 024" I I II <br />T-8" + I Nil <br />II II II <br />II I I II <br />II II II <br />PLAN VIEW (COVERS NOT SHOWN) <br />(OPTIONAL) <br />RING AND COVER 24" DIA. <br />CAST IRON <br />RING AND COVER <br />WITH GASKET <br />13" MINIMUM PLUG 2 STANDARD <br />WHEN SUBJECT (STANDARD) 2432 <br />TO TRAFFIC 24" GRADE RINGS <br />AS REQUIRED <br />INVERT VENT <br />OUTLET <br />4" PVC PIPE N RT <br />AND FITTINGS <br />6'- 9 <br />STANDARD <br />5'-4" <br />ELEVATION SECTION <br />OPERATING CAPACITY: 4000 GALLONS. <br />DESIGN LOAD: H-20 TRAFFIC WITH WATER TABLE 4 FEET BELOW FINISHED <br />GRADE AND 13 INCHES TO 6 FEET EARTH COVER. <br />SUITABLE SUB -BASE BEDDED WITH GRANULAR MATERIAL SHALL BE <br />PREPARED TO HANDLE ANTICIPATED LOADS. MINIMUM EXCAVATION <br />8'-8" x 17'-11" <br />FOR COMPLETE DESIGN AND PRODUCT INFORMATION x REQD DEPTH <br />CONTACT JENSEN PRECAST. <br />Jensen Precast reserves the right tmake changes to product design ������® <br />antl/or dimensions without notice. Please <br />ease conloc[ Jensen Precast whenever <br />5/14/2014 necessary for confirmation or advice on product design. PRECA9r <br />TY4000-EE-ST_6D4W_C.DWG <br />02014 <br />49000 GALLON <br />NTS <br />TANK <br />END OF <br />NTS <br />il6y <br />1A <br />NTS <br />9 S.S. ANCHOR BOLTS <br />Z <br />N <br />COLONY OAK SCHOOL K-8 SCHOOL <br />2 SECTION <br />O <br />NTS <br />orx <br />m <br />VALVE AS PER <br />SECTION <br />N M IJ <br />In.I <br />SEWAGE <br />LIFT STATION <br />MANUFACTURER'S <br />vI <br />s <br />W <br />2' MINIMUM <br />SPECIFICATIONS <br />Available Data: <br />a <br />4" P.V.C. PIPE <br />SOIL FACTOR= <br />DESIGN OCCUPANCY STUDENT= <br />0.20 (Per OWTS Table 9.7.2 - Soil Factors) <br />m3 <br />/ <br />JK 162 D <br />--�-308VHDSIO <br />576 Students <br />BY <br />ESTIMATED FLOW RATE PER STUDENT= <br />23 gal/day/person (Per table H 201.1(2), Schools -Cafeteria' <br />VALVE AND PIPING DIAGRAM <br />DESIGN OCCUPANCY STAFF= <br />41 Staff (Estimated 50 Employees) <br />DATE: 06-02-17 <br />ESTIMATED FLOW RATE PER PERSON= <br />20 gal/day/person (Per table H 201.1(2), Schools - Staff) <br />NTS <br />DRAWING ■ <br />NUMBER 21 <br />W <br />A. Daily Sewage Flow Rate <br />Total Daily Sewage Flow Rate = (Design Occupancy) x (Estimated <br />Flow Rate Per Person) <br />M <br />TYPE FLOW RATE QUANTITY <br />FOTAL FLOW <br />F <br />i Z <br />W <br />w0 <br />Students 23 576 <br />13,248 gpd <br />� <br />Staff 20 41 <br />820 gpd <br />14,068 gpd <br />CHRISTY BOX SCREW CAP <br />Zz <br />B. Tank Sizing <br />Calculated Tank Capacity= (Flow x 0.75) + 1125 gallons <br />(Per County of San Joaquin) <br />Calculated Tank Capacity= 11,676 gallons <br />(Per County of San Joaquin) <br />4" P.V.C. <br />C. Total Length of Trench Required <br />DOSING LINE <br />END OF LEACH <br />Total Flow= Base Tank Capacity + <br />Total Daily Flow <br />LINE (TYP.) <br />Total Flow= 1,200 + <br />14,068 <br />4" INSPECTION PIPE W/12" <br />Total Flow= 15,268 gpd <br />~ J a <br />X 1/4" SLOTS AT 12" O.C. <br />STAGGERED (0', 120', 240') <br />Disposal Field Length= Total Flow x Soil Factor <br />STOP SLOTS AT 1/2 HEIGHT <br />Disposal Field Length= 3,054 LF <br />END OF <br />NTS <br />il6y <br />1A <br />NTS <br />TION <br />7' <br />FACE OF CURB 6 " <br />SEE <br />FINISHED SURFACE 2" <br />I FLIP FINISHED SURFACE <br />O4 6 4A <br />POWER AND CONTROL CABLES <br />(ONE OF EACH REWIRED <br />FOR EACH PUMP MOTOR) <br />OVERFLOW <br />EL 81.70 6' DIA. PRE -CAST CONCRETE <br />MANHOLE (SEE GENERAL NOTES) <br />LAG PUMP ON <br />EL 60.00 <br />HIGH WATER ALARM <br />EL 59.50 <br />HIGH WATER PUMPS ON <br />EL 59.00 --__0 SUBMERSIBLE SEWAGE PUMP <br />7 <br />LOW WATER <br />PUMPS OFF GROUT 60• <br />EL SLOPE (TYP.) <br />56.00 <br />77T ---z <br />WET WELL INV <br />L EL 54.50 --I <br />'. kT <br />1 SECTION <br />NTS <br />JM 162 B <br />SECTION <br />SEWAGE LIFT STATION <br />GENERAL NOTES <br />A. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE <br />CONDITIONS PRIOR TO BEGINNING CONSTRUCTION. <br />B. ALL FITTINGS SHALL BE DUCTILE IRON, CLASS 125. <br />C. ALL CONDUITS SHALL BE P.V.C., SCHEDULE 80, OR APPROVED EQUAL. <br />ALL VALVES SHALL BE A.V.K. W/S.S SHAFTS. <br />D. ALL ELECTRICAL WIRE SHALL BE 'RHW OR 'THOU COPPER <br />CONDUCTOR, OR APPROVED EQUAL <br />E. ALL NUTS, BOLTS, AND WASHERS SHALL BE 304 S.S./316 S.S. <br />NO EXCEPTIONS. <br />F. THE FLOOR OF THE WET WELL SHALL BE SMOOTH AND LEVEL. <br />G. ALL CONDUITS TO THE WET WELL SHALL HAVE EXPLOSION PROOF <br />SEAL AT OPENING INTO THE WELL. <br />H. THE WET WELL SHALL BE CONSTRUCTED FROM A 6' CONCRETE <br />MANHOLE. ALL JOINTS SHALL BE OF 'KENT SEAL' JOINTS AND <br />THE WELL SHALL HAVE AT LEAST TWO COATS OF "XPEX' SEALANT. <br />I. CONCRETE SHALL BE PORTLAND CEMENT CONCRETE AND SHALL <br />DEVELOPE A MINIMUM COMPRESSIVE STRENGTH OF 3000 P.S.I. <br />AT 28 DAYS. <br />N/A <br />K. ALL ELECTICAL MIRING AND EQUIPMENT INSTALLED IN THE <br />WET WELL' SECTION MUST COMPLY W/ ARTICLE 22 OF THE <br />ELECTRICAL SAFETY ORDERS FOR CLASS 1, DIVISION 1, HAZARDOUS <br />LOCATION PROVISIONS OF THE *NATIONAL ELECTRICAL CODE' AND <br />ALL OTHER APPLICABLE LOCAL CODES AND ORDINANCES. <br />L ALL PRACTICES AND PROCEDURES, MATERIALS AND PLACEMENT <br />OF MATERIALS SHALL CONFORM IN EVERY RESPECT TO THE STANDARD <br />PLANS AND SPECIFICATIONS OF SAN JOAQUIN COUNTY <br />M. THE DIMENSIONS FOR THE WET WELL AND VALVE VAULT ACCESS <br />COVERS AND PUMP CONTROL PANEL SHALL BE AS SHOWN ON THE <br />PLANS AND SPECIFICATIONS OF THE MANUFACTURER. <br />N. INSTALLATION OF THE SEWAGE PUMPS AND CHECK VALVES, THE SLIDE <br />RAIL SYSTEM, THE CONTROL PANEL, AND THE PUMP CONTROL AND <br />ELECTRICAL EQUIPMENT SHALL BE IN ACCORDANCE WITH THE PLANS, <br />SPECIFICATIONS AND INSTRUCTIONS OF THE MANUFACTURER. <br />O. N/A <br />P. SUPERVISON FOR INSTALLATION, START-UP AND TESTING TO BE <br />PROVIDED BY THE MANUFACTURER'S REPRESENTATIVE AS PART <br />OF THE EQUIPMENT PURCHASE CONTRACT. <br />Q. TIE CONTRACTOR SHALL COORDINATE WITH AND HAVE <br />PG&E INSPECTION & APPROVAL <br />R. N/A <br />S. THE CONTRACTOR SHALL PROVIDE DISTRICT WITH A 1 -YEAR <br />WARRANTY OVER ALL SEWAGE LIFT STATION PARTS & APPURTENANCES. <br />T. N/A <br />'ARY SEWER PUMP <br />GENERAL NOTES <br />SEWAGE LIFT STATION <br />NOTES <br />S <br />IFINISHED SURFACE <br />(2" A.C. PAVEMENT. <br />6" AGG. BASE <br />AT 95% COMPACTION) <br />POWER AND CONTROL <br />CABLES (ONE OF EACH <br />REWIRED FOR EACH <br />PUMP MOTOR) <br />�& <br />/ \ #5 BARS 0 12" CTRS. BOTH WAYS <br />MIN. j& 2' PVC DRAIN <br />GV LVOT SHOWN) _ I .I'.. <br />12" CLASS II AGG. BASE <br />95% COMPACTION <br />ADJUSTABLE PIPE SUPPORT <br />UNDER EACH CHECK VALVE <br />-0S.S LIFTING CHAIN <br />-0B S.S. GUIDE PIPE (2' MIN) <br />18 DISCHARGE PIPE <br />9 S.S. ANCHOR BOLTS <br />Z <br />N <br />o a <br />2 SECTION <br />O <br />NTS <br />orx <br />m <br />ti <br />SECTION <br />N M IJ <br />In.I <br />SEWAGE <br />LIFT STATION <br />J� mN <br />- <br />vI <br />s <br />W <br />J. <br />a <br />¢ 0o <br />a <br />Z <br />I Q_^ <br />a Jon <br />O <br />6 <br />m3 <br />/ <br />JK 162 D <br />--�-308VHDSIO <br />a <br />BY <br />DESCRIPTION <br />C` <br />DRAWN: CRW <br />CHECKED: JPE <br />DATE: 06-02-17 <br />SCALE: AS SHOWN <br />LL <br />J <br />DRAWING ■ <br />NUMBER 21 <br />W <br />M <br />F <br />i Z <br />W <br />w0 <br />� <br />Zz <br />W D LL <br />MW <br />Om� <br />~ J a <br />�Oa <br />J <br />W Zi <br />.W0 <br />a) <br />UJ? <br />VyV <br />OrW <br />^ <br />Q <br />O <br />= <br />^ <br />^ <br />;NZ <br />y� <br />O <br />H U <br />U m <br />U <br />•.. <br />U2WW <br />W N <br />t"I <br />�ZN <br />oU x <br />'.,. <br />N2W <br />O <br />0 <br />3N <br />a <br />m an3z <br />0 <br />Totw <br />no <br />Z 12 <br />O <br />N n4 ? <br />as <br />Tn>< <br />C) <br />F <br />/7� <br />H <br />V/ <br />z� <br />a <br />SIJ <br />W <br />C7 <br />x, <br />Ld <br />i <br />o <br />9 <br />� <br />q <br />S <br />z <br />0- <br />UWi <br />o� <br />\V <br />z <br />F <br />N <br />a <br />a <br />wW <br />a a <br />N <br />U <br />i <br />i•�--.Zb <br />-"i <br />a <br />a <br />1 <br />z <br />O- <br />I <br />W <br />w V <br />W <br />W <br />N <br />5-1 <br />U <br />N N <br />~ <br />m <br />x v <br />W1\ <br />a a <br />� <br />a a <br />� <br />y <br />ti <br />o <br />0 <br />U 0 <br />U <br />PLAN <br />SEWAGE <br />LIFT STATION <br />TION <br />7' <br />FACE OF CURB 6 " <br />SEE <br />FINISHED SURFACE 2" <br />I FLIP FINISHED SURFACE <br />O4 6 4A <br />POWER AND CONTROL CABLES <br />(ONE OF EACH REWIRED <br />FOR EACH PUMP MOTOR) <br />OVERFLOW <br />EL 81.70 6' DIA. PRE -CAST CONCRETE <br />MANHOLE (SEE GENERAL NOTES) <br />LAG PUMP ON <br />EL 60.00 <br />HIGH WATER ALARM <br />EL 59.50 <br />HIGH WATER PUMPS ON <br />EL 59.00 --__0 SUBMERSIBLE SEWAGE PUMP <br />7 <br />LOW WATER <br />PUMPS OFF GROUT 60• <br />EL SLOPE (TYP.) <br />56.00 <br />77T ---z <br />WET WELL INV <br />L EL 54.50 --I <br />'. kT <br />1 SECTION <br />NTS <br />JM 162 B <br />SECTION <br />SEWAGE LIFT STATION <br />GENERAL NOTES <br />A. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE <br />CONDITIONS PRIOR TO BEGINNING CONSTRUCTION. <br />B. ALL FITTINGS SHALL BE DUCTILE IRON, CLASS 125. <br />C. ALL CONDUITS SHALL BE P.V.C., SCHEDULE 80, OR APPROVED EQUAL. <br />ALL VALVES SHALL BE A.V.K. W/S.S SHAFTS. <br />D. ALL ELECTRICAL WIRE SHALL BE 'RHW OR 'THOU COPPER <br />CONDUCTOR, OR APPROVED EQUAL <br />E. ALL NUTS, BOLTS, AND WASHERS SHALL BE 304 S.S./316 S.S. <br />NO EXCEPTIONS. <br />F. THE FLOOR OF THE WET WELL SHALL BE SMOOTH AND LEVEL. <br />G. ALL CONDUITS TO THE WET WELL SHALL HAVE EXPLOSION PROOF <br />SEAL AT OPENING INTO THE WELL. <br />H. THE WET WELL SHALL BE CONSTRUCTED FROM A 6' CONCRETE <br />MANHOLE. ALL JOINTS SHALL BE OF 'KENT SEAL' JOINTS AND <br />THE WELL SHALL HAVE AT LEAST TWO COATS OF "XPEX' SEALANT. <br />I. CONCRETE SHALL BE PORTLAND CEMENT CONCRETE AND SHALL <br />DEVELOPE A MINIMUM COMPRESSIVE STRENGTH OF 3000 P.S.I. <br />AT 28 DAYS. <br />N/A <br />K. ALL ELECTICAL MIRING AND EQUIPMENT INSTALLED IN THE <br />WET WELL' SECTION MUST COMPLY W/ ARTICLE 22 OF THE <br />ELECTRICAL SAFETY ORDERS FOR CLASS 1, DIVISION 1, HAZARDOUS <br />LOCATION PROVISIONS OF THE *NATIONAL ELECTRICAL CODE' AND <br />ALL OTHER APPLICABLE LOCAL CODES AND ORDINANCES. <br />L ALL PRACTICES AND PROCEDURES, MATERIALS AND PLACEMENT <br />OF MATERIALS SHALL CONFORM IN EVERY RESPECT TO THE STANDARD <br />PLANS AND SPECIFICATIONS OF SAN JOAQUIN COUNTY <br />M. THE DIMENSIONS FOR THE WET WELL AND VALVE VAULT ACCESS <br />COVERS AND PUMP CONTROL PANEL SHALL BE AS SHOWN ON THE <br />PLANS AND SPECIFICATIONS OF THE MANUFACTURER. <br />N. INSTALLATION OF THE SEWAGE PUMPS AND CHECK VALVES, THE SLIDE <br />RAIL SYSTEM, THE CONTROL PANEL, AND THE PUMP CONTROL AND <br />ELECTRICAL EQUIPMENT SHALL BE IN ACCORDANCE WITH THE PLANS, <br />SPECIFICATIONS AND INSTRUCTIONS OF THE MANUFACTURER. <br />O. N/A <br />P. SUPERVISON FOR INSTALLATION, START-UP AND TESTING TO BE <br />PROVIDED BY THE MANUFACTURER'S REPRESENTATIVE AS PART <br />OF THE EQUIPMENT PURCHASE CONTRACT. <br />Q. TIE CONTRACTOR SHALL COORDINATE WITH AND HAVE <br />PG&E INSPECTION & APPROVAL <br />R. N/A <br />S. THE CONTRACTOR SHALL PROVIDE DISTRICT WITH A 1 -YEAR <br />WARRANTY OVER ALL SEWAGE LIFT STATION PARTS & APPURTENANCES. <br />T. N/A <br />'ARY SEWER PUMP <br />GENERAL NOTES <br />SEWAGE LIFT STATION <br />NOTES <br />S <br />IFINISHED SURFACE <br />(2" A.C. PAVEMENT. <br />6" AGG. BASE <br />AT 95% COMPACTION) <br />POWER AND CONTROL <br />CABLES (ONE OF EACH <br />REWIRED FOR EACH <br />PUMP MOTOR) <br />�& <br />/ \ #5 BARS 0 12" CTRS. BOTH WAYS <br />MIN. j& 2' PVC DRAIN <br />GV LVOT SHOWN) _ I .I'.. <br />12" CLASS II AGG. BASE <br />95% COMPACTION <br />ADJUSTABLE PIPE SUPPORT <br />UNDER EACH CHECK VALVE <br />-0S.S LIFTING CHAIN <br />-0B S.S. GUIDE PIPE (2' MIN) <br />18 DISCHARGE PIPE <br />41TARY <br />PUMP <br />VIEW <br />�o5 <br />0 <br />Or <br />w� <br />(08- <br />122 1 _1221 <br />a� <br />N0 <br />om <br />9 S.S. ANCHOR BOLTS <br />Z <br />ORIGINAL GROUND L 3" CLEAR <br />1' BASE <br />#5 BARS 0 12" CTRS, BOTH WAYS <br />12" CLASS II AGG. BASE <br />95% COMPACTION <br />2 SECTION <br />O <br />NTS <br />orx <br />m <br />JM162A <br />SECTION <br />N M IJ <br />In.I <br />SEWAGE <br />LIFT STATION <br />J� mN <br />- <br />41TARY <br />PUMP <br />VIEW <br />�o5 <br />0 <br />Or <br />w� <br />(08- <br />122 1 _1221 <br />a� <br />N0 <br />om <br />I PANEL I <br />l SEWAGE LIFT STATION <br />IY SEWER PUMP ST <br />WASTE WATER DISPOSAL SPECIFICATIONS <br />I. DESIGN CRITERIA: <br />1. 2016 CALIFORNIA PLUMBING CODE AND SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT ON-SITE WASTEWATER DISPOSAL <br />STANDARDS. <br />II. GENERAL NOTES: <br />1. THE DISPOSAL SYSTEM COVERED UNDER THIS CONTRACT AND <br />DESIGNED HEREIN CONSISTS OF ALL WORK TO BE DONE AS SHOWN <br />ON THE PLANS. THIS WORK CONSISTS OF THE CONSTRUCTION OF <br />THE DISTRIBUTION LINE WITH ITS APPURTENANCES AND THE <br />CONSTRUCTION OF THE LEACH FIELD SYSTEM. <br />2. APPROPRIATE SUPERVISION DURING CONSTRUCTION IS MANDATORY TO <br />ENSURE THAT THE DESIGN IS ADHERED TO, TO PROVIDE THE DESIRED <br />FUNCTIONAL QUALITY OF THE SYSTEM. <br />III. DISPOSAL SYSTEM NOTES: <br />I. THE SEWAGE DISPOSAL SYSTEM CONSISTS OF A DRAIN UNE FROM <br />THE BUILDINGS TO THE SEPTIC TANK, THE SEPTIC TANK, THE <br />DISTRIBUTION BOXES, THE CONVEYANCE LINES AND THE LEACH LINES. <br />2. CONVEYANCE PIPE SHALL BE AS APPROVED BY SAN JOAQUIN COUNTY <br />STANDARDS AND THE 2016 CALIFORNIA PLUMBING CODE, ANY <br />MATERIALS USED SHALL CONFORM TO THE CURRENT STANDARD <br />SPECIFICATIONS OF THE AMERICAN NATIONAL STANDARDS INSTITUTE. <br />3. SEPTIC TANK: <br />SEPTIC TANK: (3) 4,000 GALLON TANKS <br />TOTAL SEPTIC TANK CAPACITY: 12,000 GALLONS <br />4. LAYING PIPE: THE PIPE SHALL BE LAID TO CONFORM TO THE <br />PRESCRIBED LINES AND GRADES. THE LINE AND GRADE SHALL BE <br />OBTAINED BY MEANS OF A LASER BEAM OR BY MEASURING FROM A <br />TIGHTLY STRETCHED STRING OR WIRE SET FROM THE SURVEY STAKES. <br />ALL ADJUSTMENTS OF PIPE TO LINE AND GRADE SHALL BE MADE BY <br />SCRAPING AWAY OR FILLING IN AND TAMPING UNDER THE BODY OF <br />THE PIPE, NOT BY BLOCKING OR WEDGING. <br />5. THE MANUFACTURER'S RECOMMENDATIONS ON PROPER PROCEDURES <br />FOR LAYING PIPE SHALL BE FOLLOWED. <br />6. ALL PIPE SHALL BE LAID WITH THE BELL END UPSTREAM AND SHALL <br />BE LAID UPSTREAM FROM STRUCTURE TO STRUCTURE. THREE GRADE <br />STAKES PER 100 FOOT INTERVAL SHALL BE PROVIDED, AND EACH <br />STAKE SHALL BE USED IN ESTABLISHING THE GRADE AND <br />ALIGNMENT FOR THE SEWER. <br />7. LEACH LINES SHALL BE CONSTRUCTED AS PER THE DETAILS SHOWN <br />ON THE PLAN. <br />8. DISTRIBUTION LINE: THE DISTRIBUTION PIPE SHALL BE P.V.C. 1120 <br />PRESSURE RATED PIPE 125 P.S.I.- SDR 32.5 CONFORMING TO <br />A.S.T.M. D2241. <br />9. CONNECTIONS: CONNECTIONS ARE TO BE MADE USING SOLVENT <br />CEMENT JOINTS PER MANUFACTURE'S RECOMMENDATIONS CAPABLE OF <br />SUPPORTING THE LINE RATED PRESSURE, <br />10. LEACH LINES: USE RING TITS P.V.C. 4" DIAMETER TO BE <br />PRE -PERFORATED PER SAN JOAQUIN COUNTY STANDARDS. FITTINGS <br />TO BE RUBBER RINGS CONFORMING TO A.S.T.M. D1869. <br />11. GRAVEL: COARSE GRADED GRAVEL USED IN LEACH LINE IS TO BE 1 <br />INCH MINIMUM TO 2 1/2 INCH MAXIMUM WASHED ROCK AGGREGATE. <br />12. PROTECTION BARRIER: UNTREATED PAPER, FILTER FABRIC, STRAW, OR <br />OTHER APPROVED MATERIAL IS TO BE USED AS A BARRIER ON TOP <br />OF THE GRAVEL SEPARATING THE ROCKS FROM THE SOIL BACKFILL. <br />13. RECORDS OF MONTHLY WATER USE SHALL BE MAINTAINED AND <br />COPIES MADE AVAILABLE TO THE ENGINEER AND/OR COUNTY UPON <br />REQUEST. <br />14. THE TANKS SHALL BE INSPECTED BASED ON THE APPROVED NOTICE <br />OF APPUCABILTTY (NCA) FILED WITH THE STATE WATER RESOURCES <br />CONTROL BOARD TO ENSURE THAT THE CAPACITY OF THE TANKS ARE <br />OPERATIONAL. THE RECEIPT, NAME AND DATE OF SERVICE OF THE <br />COMPANY INSPECTING, OR PUMPING THE TANK OUT, SHALL BE <br />PROVIDED TO THE COUNTY, OR THE ENGINEER UPON REQUEST. <br />15. THE ON SITE SEWAGE DIVISION, OR OTHERS DESIGNATED, WILL ALSO <br />MONITOR THE WELLS. IF SYSTEM FAILURE IS DETERMINED, OR <br />EMINENT IN THE OPINION OF THE ON -SITE -SEWAGE DIVISION, A <br />SIMILAR SYSTEM WILL BE CONSTRUCTED IN THE RESERVE AREA <br />DESIGNATED. IT IS TO BE OPERATED ON AN ALTERNATIVE BASIS WITH <br />THE PRIMARY AREA. SIGNS OF SEPTIC SYSTEM FAILURE INCLUDE <br />DISCHARGE OF SEWAGE TO THE GROUND SURFACE AND SATURATED <br />UPPER SOILS HORIZONS DURING PERIODS OF DRY WEATHER. IF THE <br />SYSTEM IS CLEARLY FAILING, THE DESIGNER AND ON -SITE -SEWAGE <br />DIVISION SHOULD BE NOTIFIED IMMEDIATELY. WATER LEVELS IN THE <br />INSPECTION PIPES OR MONITORING WELLS WHICH ARE VERY NEAR <br />THE GROUND SURFACE MAY INDICATE POTENTIAL PROBLEMS BUT DO <br />NOT ALONE CONSTITUTE FAILURE. IN SUCH CASES, THE SYSTEM <br />SHOULD BE MONITORED MORE FREQUENTLY FOR CLEAR SIGNS OF <br />FAILURE, PERHAPS ONCE PER WEEK UNTIL A CLEAR PATTERN IS <br />DEVELOPED. <br />16. TRIMMER VALVES SHALL BE PLASTIC BALL VALVES, EQUAL TO THE <br />LATERAL SIZE. THE VALVES SHALL BE PROVIDED WITH VALVE BOXES <br />AND SHALL BE SET IN A PEA GRAVEL BASE. <br />17. THE DISPOSAL FIELD SHALL BE DOSED BY GRAVITY. <br />18. ALL OTHER SEPTIC SYSTEM CONSTRUCTION DETAILS AS PER ON SITE <br />SEWAGE DIVISION REQUIREMENTS. <br />19. OWNER SHALL BE RESPONSIBLE FOR SCHEDULING INSPECTIONS. <br />20. INSPECTIONS DURING CONSTRUCTION BY THE DESIGNER AND IN SOME <br />CASES, THE REGULATORY AUTHORITY ARE REQUIRED. THE INSTALLER <br />AND/OR OWNER ARE SOLELY RESPONSIBLE FOR CONTACTING THE <br />DESIGNER AND/OR REGULATORY AUTHORITY AT LEAST 24 HOURS IN <br />ADVANCE OF EACH REQUIRED INSPECTION. EVERY EFFORT WILL BE <br />MADE TO RESPOND WITHIN 24 HOURS, HOWEVER ADDITIONAL NOTICE <br />MAY SOMETIMES BE REQUIRED AT SOMETIME IN THE FUTURE. <br />21. THE PERMIT AND AN APPROVED SET OF DESIGN DOCUMENTS MUST <br />BE ON THE JOB SITE AT ALL TIMES. <br />22. THE INSTALLER AND/OR OWNER ARE SOLELY RESPONSIBLE FOR <br />ENSURING THAT ALL PROPERTY BOUNDARIES ARE ACCURATELY <br />MARKED, THAT ALL APPROPRIATE SETBACKS ARE OBSERVED, AND <br />THAT UNDERGROUND AND/OR OVERHEAD UTILITIES AND/OR UTILITY <br />EASEMENTS ARE IDENTIFIED PRIOR TO CONSTRUCTION. <br />23. UNDER NO CIRCUMSTANCES SHALL THE DISPOSAL OR REPLACEMENT <br />AREAS, OR RELATIVE POSITIONS OF THE OTHER SYSTEM COMPONENTS, <br />BE MODIFIED WITHOUT PRIOR CONSENT FROM THE DESIGNER AND THE <br />REGULATORY AUTHORITY. <br />24. IF THE SOIL IN THE DISPOSAL AREA CAN BE FORMED INTO A RIBBON <br />IT IS TOO WET TO EXCAVATE. DO NOT REMOVE VEGETATION, OPERATE <br />EQUIPMENT, OR OTHERWISE DISTURB SOILS IN THE DISPOSAL AREA <br />UNTIL RECEIVING APPROVAL FROM THE DESIGNER. <br />25. DISTURBANCE OF NATIVE SOILS IN THE DISPOSAL AND/OR <br />REPLACEMENT AREAS AND FOR A DISTANCE OF 50 FEET BELOW THE <br />DISPOSAL OR REPLACEMENT AREA MAY CAUSE PREMATURE SYSTEM <br />FAILURE. DO NOT ALLOW VEHICULAR TRAFFIC, CONSTRUCTION <br />EQUIPMENT, OR LIVESTOCK IN THE AREA WITHIN OR BELOW THE <br />DISPOSAL OR REPLACEMENT AREAS. <br />26. DO NOT DIRECT CONCENTRATED SURFACE WATER RUNOFF ONTO <br />ADJACENT PROPERTIES. <br />27. ALL SEPTIC SYSTEMS, REGARDLESS OF TYPE, HAVE FINITE LIFE SPANS <br />AND AS SUCH WILL NOT OPERATE INDEFINITELY. IN ACCEPTING THIS <br />PLAN, THE OWNER UNDERSTANDS AND ACCEPTS THAT REPAIR AND/OR <br />REPLACEMENT OF ALL OR PORTIONS OF THIS SYSTEM WILL LIKELY BE <br />REQUIRED AT SOMETIME IN THE FUTURE. <br />28. THIS SYSTEM IS DESIGNED TO ACCOMMODATE A FINITE QUANTITY OF <br />WASTEWATER. ADDITIONAL WASTEWATER WILL NOT BE TREATED <br />PROPERLY BY THIS SYSTEM AND WILL DAMAGE ITS COMPONENTS. <br />WASTEWATER GENERATION EXCEEDING THE DAILY DESIGN FLOW RATE <br />LISTED ELSEWHERE ON THESE PLANS IS LIKELY TO DAMAGE THE <br />SYSTEM OR CAUSE FAILURE AND IS STRICTLY PROHIBITED. <br />29. THE CREATION OF CUT BANKS BELOW THE DISPOSAL OR <br />REPLACEMENT AREAS INCREASES THE POSSIBILITY OF INTERCEPTION <br />AND SURFACING OF MIGRATING EFFLUENT AND SHOULD ALWAYS BE <br />AVOIDED. CUT BANKS BELOW THE DISPOSAL OR REPLACEMENT AREAS <br />ARE CREATED SOLELY AT THE RISK OF THE OWNER. <br />30. THE DISTURBANCE OF NATIVE SOILS WITHIN OR BELOW THE DISPOSAL <br />OR REPLACEMENT AREAS INCREASE THE POSSIBILITY OF SOIL <br />STRUCTURE DAMAGE AND MAY LEAD TO DISPOSAL FIELD FAILURE. <br />DISTURBANCE OF NATIVE SOILS WITHIN OR BELOW THE DISPOSAL OR <br />REPLACEMENT AREAS BY ANY MEANS INCLUDING VEHICULAR TRAFFIC, <br />GRADING, LIVESTOCK, ETC.. IS PROHIBITED AND WILL INVALIDATE THIS <br />DESIGN. <br />COPYRIGHT 2017 NORTHSTAR ENGINEERING GROUP, INC <br />CLIENT FOCUSED PASSION DRIVEN <br />IINORTHERN CALIFORNIA <br />1110 IRON POINT ROAD, SUITE 200 <br />FOLSOM <br />CALIFORNIA 9563048301 <br />TEL: 916-355-9922 <br />www.vAcarchftects.com <br />� J <br />pp <br />um <br />O <br />Z CJ <br />Co <br />J cca. <br />W � <br />Q <br />Cop <br />CIO <br />Cj Cj p <br />� J <br />ap <br />W V <br />Ca <br />Z <br />AC _ FLS _ SS <br />DATE <br />O <br />O <br />orx <br />m <br />F <br />N M IJ <br />In.I <br />J� mN <br />- <br />vI <br />s <br />W <br />J. <br />a <br />¢ 0o <br />a <br />Z <br />I Q_^ <br />a Jon <br />O <br />6 <br />m3 <br />/ <br />JK 162 D <br />I PANEL I <br />l SEWAGE LIFT STATION <br />IY SEWER PUMP ST <br />WASTE WATER DISPOSAL SPECIFICATIONS <br />I. DESIGN CRITERIA: <br />1. 2016 CALIFORNIA PLUMBING CODE AND SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT ON-SITE WASTEWATER DISPOSAL <br />STANDARDS. <br />II. GENERAL NOTES: <br />1. THE DISPOSAL SYSTEM COVERED UNDER THIS CONTRACT AND <br />DESIGNED HEREIN CONSISTS OF ALL WORK TO BE DONE AS SHOWN <br />ON THE PLANS. THIS WORK CONSISTS OF THE CONSTRUCTION OF <br />THE DISTRIBUTION LINE WITH ITS APPURTENANCES AND THE <br />CONSTRUCTION OF THE LEACH FIELD SYSTEM. <br />2. APPROPRIATE SUPERVISION DURING CONSTRUCTION IS MANDATORY TO <br />ENSURE THAT THE DESIGN IS ADHERED TO, TO PROVIDE THE DESIRED <br />FUNCTIONAL QUALITY OF THE SYSTEM. <br />III. DISPOSAL SYSTEM NOTES: <br />I. THE SEWAGE DISPOSAL SYSTEM CONSISTS OF A DRAIN UNE FROM <br />THE BUILDINGS TO THE SEPTIC TANK, THE SEPTIC TANK, THE <br />DISTRIBUTION BOXES, THE CONVEYANCE LINES AND THE LEACH LINES. <br />2. CONVEYANCE PIPE SHALL BE AS APPROVED BY SAN JOAQUIN COUNTY <br />STANDARDS AND THE 2016 CALIFORNIA PLUMBING CODE, ANY <br />MATERIALS USED SHALL CONFORM TO THE CURRENT STANDARD <br />SPECIFICATIONS OF THE AMERICAN NATIONAL STANDARDS INSTITUTE. <br />3. SEPTIC TANK: <br />SEPTIC TANK: (3) 4,000 GALLON TANKS <br />TOTAL SEPTIC TANK CAPACITY: 12,000 GALLONS <br />4. LAYING PIPE: THE PIPE SHALL BE LAID TO CONFORM TO THE <br />PRESCRIBED LINES AND GRADES. THE LINE AND GRADE SHALL BE <br />OBTAINED BY MEANS OF A LASER BEAM OR BY MEASURING FROM A <br />TIGHTLY STRETCHED STRING OR WIRE SET FROM THE SURVEY STAKES. <br />ALL ADJUSTMENTS OF PIPE TO LINE AND GRADE SHALL BE MADE BY <br />SCRAPING AWAY OR FILLING IN AND TAMPING UNDER THE BODY OF <br />THE PIPE, NOT BY BLOCKING OR WEDGING. <br />5. THE MANUFACTURER'S RECOMMENDATIONS ON PROPER PROCEDURES <br />FOR LAYING PIPE SHALL BE FOLLOWED. <br />6. ALL PIPE SHALL BE LAID WITH THE BELL END UPSTREAM AND SHALL <br />BE LAID UPSTREAM FROM STRUCTURE TO STRUCTURE. THREE GRADE <br />STAKES PER 100 FOOT INTERVAL SHALL BE PROVIDED, AND EACH <br />STAKE SHALL BE USED IN ESTABLISHING THE GRADE AND <br />ALIGNMENT FOR THE SEWER. <br />7. LEACH LINES SHALL BE CONSTRUCTED AS PER THE DETAILS SHOWN <br />ON THE PLAN. <br />8. DISTRIBUTION LINE: THE DISTRIBUTION PIPE SHALL BE P.V.C. 1120 <br />PRESSURE RATED PIPE 125 P.S.I.- SDR 32.5 CONFORMING TO <br />A.S.T.M. D2241. <br />9. CONNECTIONS: CONNECTIONS ARE TO BE MADE USING SOLVENT <br />CEMENT JOINTS PER MANUFACTURE'S RECOMMENDATIONS CAPABLE OF <br />SUPPORTING THE LINE RATED PRESSURE, <br />10. LEACH LINES: USE RING TITS P.V.C. 4" DIAMETER TO BE <br />PRE -PERFORATED PER SAN JOAQUIN COUNTY STANDARDS. FITTINGS <br />TO BE RUBBER RINGS CONFORMING TO A.S.T.M. D1869. <br />11. GRAVEL: COARSE GRADED GRAVEL USED IN LEACH LINE IS TO BE 1 <br />INCH MINIMUM TO 2 1/2 INCH MAXIMUM WASHED ROCK AGGREGATE. <br />12. PROTECTION BARRIER: UNTREATED PAPER, FILTER FABRIC, STRAW, OR <br />OTHER APPROVED MATERIAL IS TO BE USED AS A BARRIER ON TOP <br />OF THE GRAVEL SEPARATING THE ROCKS FROM THE SOIL BACKFILL. <br />13. RECORDS OF MONTHLY WATER USE SHALL BE MAINTAINED AND <br />COPIES MADE AVAILABLE TO THE ENGINEER AND/OR COUNTY UPON <br />REQUEST. <br />14. THE TANKS SHALL BE INSPECTED BASED ON THE APPROVED NOTICE <br />OF APPUCABILTTY (NCA) FILED WITH THE STATE WATER RESOURCES <br />CONTROL BOARD TO ENSURE THAT THE CAPACITY OF THE TANKS ARE <br />OPERATIONAL. THE RECEIPT, NAME AND DATE OF SERVICE OF THE <br />COMPANY INSPECTING, OR PUMPING THE TANK OUT, SHALL BE <br />PROVIDED TO THE COUNTY, OR THE ENGINEER UPON REQUEST. <br />15. THE ON SITE SEWAGE DIVISION, OR OTHERS DESIGNATED, WILL ALSO <br />MONITOR THE WELLS. IF SYSTEM FAILURE IS DETERMINED, OR <br />EMINENT IN THE OPINION OF THE ON -SITE -SEWAGE DIVISION, A <br />SIMILAR SYSTEM WILL BE CONSTRUCTED IN THE RESERVE AREA <br />DESIGNATED. IT IS TO BE OPERATED ON AN ALTERNATIVE BASIS WITH <br />THE PRIMARY AREA. SIGNS OF SEPTIC SYSTEM FAILURE INCLUDE <br />DISCHARGE OF SEWAGE TO THE GROUND SURFACE AND SATURATED <br />UPPER SOILS HORIZONS DURING PERIODS OF DRY WEATHER. IF THE <br />SYSTEM IS CLEARLY FAILING, THE DESIGNER AND ON -SITE -SEWAGE <br />DIVISION SHOULD BE NOTIFIED IMMEDIATELY. WATER LEVELS IN THE <br />INSPECTION PIPES OR MONITORING WELLS WHICH ARE VERY NEAR <br />THE GROUND SURFACE MAY INDICATE POTENTIAL PROBLEMS BUT DO <br />NOT ALONE CONSTITUTE FAILURE. IN SUCH CASES, THE SYSTEM <br />SHOULD BE MONITORED MORE FREQUENTLY FOR CLEAR SIGNS OF <br />FAILURE, PERHAPS ONCE PER WEEK UNTIL A CLEAR PATTERN IS <br />DEVELOPED. <br />16. TRIMMER VALVES SHALL BE PLASTIC BALL VALVES, EQUAL TO THE <br />LATERAL SIZE. THE VALVES SHALL BE PROVIDED WITH VALVE BOXES <br />AND SHALL BE SET IN A PEA GRAVEL BASE. <br />17. THE DISPOSAL FIELD SHALL BE DOSED BY GRAVITY. <br />18. ALL OTHER SEPTIC SYSTEM CONSTRUCTION DETAILS AS PER ON SITE <br />SEWAGE DIVISION REQUIREMENTS. <br />19. OWNER SHALL BE RESPONSIBLE FOR SCHEDULING INSPECTIONS. <br />20. INSPECTIONS DURING CONSTRUCTION BY THE DESIGNER AND IN SOME <br />CASES, THE REGULATORY AUTHORITY ARE REQUIRED. THE INSTALLER <br />AND/OR OWNER ARE SOLELY RESPONSIBLE FOR CONTACTING THE <br />DESIGNER AND/OR REGULATORY AUTHORITY AT LEAST 24 HOURS IN <br />ADVANCE OF EACH REQUIRED INSPECTION. EVERY EFFORT WILL BE <br />MADE TO RESPOND WITHIN 24 HOURS, HOWEVER ADDITIONAL NOTICE <br />MAY SOMETIMES BE REQUIRED AT SOMETIME IN THE FUTURE. <br />21. THE PERMIT AND AN APPROVED SET OF DESIGN DOCUMENTS MUST <br />BE ON THE JOB SITE AT ALL TIMES. <br />22. THE INSTALLER AND/OR OWNER ARE SOLELY RESPONSIBLE FOR <br />ENSURING THAT ALL PROPERTY BOUNDARIES ARE ACCURATELY <br />MARKED, THAT ALL APPROPRIATE SETBACKS ARE OBSERVED, AND <br />THAT UNDERGROUND AND/OR OVERHEAD UTILITIES AND/OR UTILITY <br />EASEMENTS ARE IDENTIFIED PRIOR TO CONSTRUCTION. <br />23. UNDER NO CIRCUMSTANCES SHALL THE DISPOSAL OR REPLACEMENT <br />AREAS, OR RELATIVE POSITIONS OF THE OTHER SYSTEM COMPONENTS, <br />BE MODIFIED WITHOUT PRIOR CONSENT FROM THE DESIGNER AND THE <br />REGULATORY AUTHORITY. <br />24. IF THE SOIL IN THE DISPOSAL AREA CAN BE FORMED INTO A RIBBON <br />IT IS TOO WET TO EXCAVATE. DO NOT REMOVE VEGETATION, OPERATE <br />EQUIPMENT, OR OTHERWISE DISTURB SOILS IN THE DISPOSAL AREA <br />UNTIL RECEIVING APPROVAL FROM THE DESIGNER. <br />25. DISTURBANCE OF NATIVE SOILS IN THE DISPOSAL AND/OR <br />REPLACEMENT AREAS AND FOR A DISTANCE OF 50 FEET BELOW THE <br />DISPOSAL OR REPLACEMENT AREA MAY CAUSE PREMATURE SYSTEM <br />FAILURE. DO NOT ALLOW VEHICULAR TRAFFIC, CONSTRUCTION <br />EQUIPMENT, OR LIVESTOCK IN THE AREA WITHIN OR BELOW THE <br />DISPOSAL OR REPLACEMENT AREAS. <br />26. DO NOT DIRECT CONCENTRATED SURFACE WATER RUNOFF ONTO <br />ADJACENT PROPERTIES. <br />27. ALL SEPTIC SYSTEMS, REGARDLESS OF TYPE, HAVE FINITE LIFE SPANS <br />AND AS SUCH WILL NOT OPERATE INDEFINITELY. IN ACCEPTING THIS <br />PLAN, THE OWNER UNDERSTANDS AND ACCEPTS THAT REPAIR AND/OR <br />REPLACEMENT OF ALL OR PORTIONS OF THIS SYSTEM WILL LIKELY BE <br />REQUIRED AT SOMETIME IN THE FUTURE. <br />28. THIS SYSTEM IS DESIGNED TO ACCOMMODATE A FINITE QUANTITY OF <br />WASTEWATER. ADDITIONAL WASTEWATER WILL NOT BE TREATED <br />PROPERLY BY THIS SYSTEM AND WILL DAMAGE ITS COMPONENTS. <br />WASTEWATER GENERATION EXCEEDING THE DAILY DESIGN FLOW RATE <br />LISTED ELSEWHERE ON THESE PLANS IS LIKELY TO DAMAGE THE <br />SYSTEM OR CAUSE FAILURE AND IS STRICTLY PROHIBITED. <br />29. THE CREATION OF CUT BANKS BELOW THE DISPOSAL OR <br />REPLACEMENT AREAS INCREASES THE POSSIBILITY OF INTERCEPTION <br />AND SURFACING OF MIGRATING EFFLUENT AND SHOULD ALWAYS BE <br />AVOIDED. CUT BANKS BELOW THE DISPOSAL OR REPLACEMENT AREAS <br />ARE CREATED SOLELY AT THE RISK OF THE OWNER. <br />30. THE DISTURBANCE OF NATIVE SOILS WITHIN OR BELOW THE DISPOSAL <br />OR REPLACEMENT AREAS INCREASE THE POSSIBILITY OF SOIL <br />STRUCTURE DAMAGE AND MAY LEAD TO DISPOSAL FIELD FAILURE. <br />DISTURBANCE OF NATIVE SOILS WITHIN OR BELOW THE DISPOSAL OR <br />REPLACEMENT AREAS BY ANY MEANS INCLUDING VEHICULAR TRAFFIC, <br />GRADING, LIVESTOCK, ETC.. IS PROHIBITED AND WILL INVALIDATE THIS <br />DESIGN. <br />COPYRIGHT 2017 NORTHSTAR ENGINEERING GROUP, INC <br />CLIENT FOCUSED PASSION DRIVEN <br />IINORTHERN CALIFORNIA <br />1110 IRON POINT ROAD, SUITE 200 <br />FOLSOM <br />CALIFORNIA 9563048301 <br />TEL: 916-355-9922 <br />www.vAcarchftects.com <br />� J <br />pp <br />um <br />O <br />Z CJ <br />Co <br />J cca. <br />W � <br />Q <br />Cop <br />CIO <br />Cj Cj p <br />� J <br />ap <br />W V <br />Ca <br />CA <br />Max Ivan Medina <br />C-24882 <br />s t� �. <br />..9� 111 OB•30-17 = <br />CONSULTANT <br />+✓YOY'I�/�e� <br />Engineerilte Group/ Inc, <br />e CML ENGINERMG a SURYEI7NG • PLANNING w <br />620 12th Street Modesto, C4 95754 <br />(209) 524-7525 Phone (209) 524-7526 Fox <br />O <br />AC _ FLS _ SS <br />DATE <br />O <br />orx <br />C) <br />g0 <br />W <br />a <br />Z <br />Q <br />O <br />0- <br />Z <br />BY <br />DESCRIPTION <br />O <br />DRAWN: CRW <br />CHECKED: JPE <br />DATE: 06-02-17 <br />SCALE: AS SHOWN <br />LL <br />DETAILS AND <br />CROSS <br />SECTIONIlesS <br />CA <br />Max Ivan Medina <br />C-24882 <br />s t� �. <br />..9� 111 OB•30-17 = <br />CONSULTANT <br />+✓YOY'I�/�e� <br />Engineerilte Group/ Inc, <br />e CML ENGINERMG a SURYEI7NG • PLANNING w <br />620 12th Street Modesto, C4 95754 <br />(209) 524-7525 Phone (209) 524-7526 Fox <br />FILE# XX -XX <br />IDENTIFICATION STAMP <br />DIV. OF THE STATE ARCHITECT <br />OFFICE OF REGULATION SERVICES <br />APPL.# 02-115513 <br />AC _ FLS _ SS <br />DATE <br />NO <br />DATE <br />BY <br />DESCRIPTION <br />REVISIONS <br />DRAWN: CRW <br />CHECKED: JPE <br />DATE: 06-02-17 <br />SCALE: AS SHOWN <br />PROJECT NUMBER 1520100 <br />DETAILS AND <br />CROSS <br />SECTIONIlesS <br />DRAWING ■ <br />NUMBER 21 <br />